Same agency, volume and box · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗OEM
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000173703
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
•** -'OCT 26 ’98 14:33 PR PMBPSSPDOR CONSTR. C0212 949 9762 TO 6694107 P.03/05 ....... 4009 TO PnBASSPDCR P.01/02
ROBERT B. SAMUELS INC.
TO: COMPANY NAMS:
ATTENTION OF: £
FAX;
FROM: GAS.Y FISHBONE
FAX #: (212) 213-4089
TOTAL NUMBER OF PAGES inCLUDXNO CC'TER SHEET:
DATE:
RFPttRENCE: _________
T) ^7^
6osr
352 PARK AVENUE SOUTH/NEW YORK 10010/ 686-6700/FAX: 213-4089
97>: P.03 □CT-26-1998 14:29 212 949 9762
NYC-WTC_000173703
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
Same agency, volume and box · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172501
Addendum #1 to a construction cost estimate for the Mayor's Office of Emergency Management space at the World Trade Center.
Same agency, volume and box · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172473
Addendum #1 to a construction cost estimate regarding electric fixtures for the Mayor's Office at the World Trade Center.
Same agency, volume and box · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173419
Correspondence from ACE Audiovisual explaining price reductions for monitor elimination and clarifying switching device requirements.
Same agency, volume and box · similarity 0.910
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171872
Internal memo summarizing net cost changes for shelving height modifications and unit additions at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173980
A fax cover sheet from the Department of Citywide Administrative Services Bureau of Space dated January 14, 1999.
1 shared topics · Same agency, volume and box · similarity 0.908
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173038
Contractor explains that switching devices were retained despite monitor elimination to ensure equipment functionality.
Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173144
A letter from ACE Audiovisual explaining price reductions for the removal of monitors at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173027
ACE Audiovisual explains price reductions for eliminating monitors while retaining necessary switching devices.
Same agency, volume and box · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000100942
March 2003 fax cover sheet regarding site cleanup activities at the World Trade Center.
1 shared topics · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Cover sheet for a fax from Cantor Seinuk Group regarding section and elevation drawings at 7 World Trade Center.
Filed in the same folder
Cover sheet for a fax from Cantor Seinuk Group regarding the Office of Emergency Management project.
Filed in the same folder
NYC-WTC_000166836
Correspondence from a consulting engineering firm to the Mayor's Office of Emergency Management regarding project specifications.
Filed in the same folder
NYC-WTC_000166873
Document containing technical specifications for equipment required by the Mayor's Office of Emergency Management.
Filed in the same folder
NYC-WTC_000167206
Change order proposal totaling $91,550 for hurricane wall designs and reimbursables for Mayor's Office of Emergency Management project.
Filed in the same folder