Document / 2 pages
A/V cost reduction offer, 7 World Trade Center, June 1998 Machine-extracted title · confidence 92% Correspondence from ACE Audiovisual explaining price reductions for monitor elimination and clarifying switching device requirements.
NYC-WTC_000173419–000173420 Folder label: “Mayor's Office of Emergency Management 7 World Trade Center 1st, 7th & 23rd Floors New York, NY Project # 96-1346”
Save to case Cite this page ↗
More like this page Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
ACE Audiovisual response re: monitor reduction, June 1998 · page 2 · Box 7DCAS NYC-WTC_000173144
A letter from ACE Audiovisual explaining price reductions for the removal of monitors at the Mayor's Office of Emergency Management.
Similarity score 0.972 (not a probability)
ACE Audiovisual price reduction explanation, 7 WTC OEM, Jun 1998 · page 2 · Box 7DCAS NYC-WTC_000173038
Contractor explains that switching devices were retained despite monitor elimination to ensure equipment functionality.
Similarity score 0.972 (not a probability)
ACE Audiovisual proposal reduction letter, 7 WTC OEM, Jun 1998 · page 2 · Box 7DCAS NYC-WTC_000173027
ACE Audiovisual explains price reductions for eliminating monitors while retaining necessary switching devices.
Similarity score 0.968 (not a probability)
Change order for electrical riser installation, 7 World Trade Center, · page 2 · Box 7DCAS NYC-WTC_000171626
Proposal to install galvanized conduit and fiber optic cables between the loading dock and 23rd floor LAN room for $45,000.
Similarity score 0.954 (not a probability)
NYC-WTC_000172675 · page 1 · Box 7DCAS Similarity score 0.954 (not a probability)
ACE Audiovisual proposal response, June 1998 · page 2 · Box 7DCAS NYC-WTC_000173295
Fax from ACE Audiovisual responding to a request regarding price reductions for eliminating monitors and clarifying AV equipment scope.
Similarity score 0.953 (not a probability)