Change Order #97 proposal for 7 World Trade Center oil

Machine-extracted title · confidence 92%

Proposal to enclose fuel oil lines with sheetrock instead of vermiculite at the Mayor's Office of Emergency Management.

NYC-WTC_000171342

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center Change Order #097 Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000171342
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SEP 24 ’99 16:12 PR PTIBASSADOR CONSTR. C0212 949 9762 TO 7325190 P.02/02

AMBASSADOR CONSTRUCTION CO.. INC.

September 24,1999 Mr. Walter Weems Silverstein Properties Inc. 7 World Trade Center New York, NY 10048

Re; Mayor’s Office of Emergency Management 7 World Trade Center Change Order #097 Amb. Job.#S57t5175

Dear Mr. Weems:

We are pleased to submit herewith our change order #097 to perform the following work at the above referenced premises for the sum of FOUR THOUSAND FIVE HUNDRED SIXTY DOLLARS ($4,560.00);

SCOPE OF WORK Based on Swanke Hayden Connell’s plan A-1-1 dated 8/17/99 where it shows the fuel oil lines being enclosed with 2-hour rated sheetrock assembly in lieu of the 2-hour rated vermiculite enclosure originally priced. The difference is as follows.

Vermiculite $15,000.00 Sheetrock _t8,925..Q0 Difference $3,925.00 General Conditions $314.00 Overhead & Fee ? 254.00 Insurance ..___6JLQ.O Z Total $4,560.00

Please return this change order with your approval so that we may continue with this work.

Very truly yours, / / / CJ^STRUCTIDN CO., INC.

Martin Schneider Vice President

cc; Juan Mejia / SHC Glenn Pymento / DCAS

MS;am Accepted: ________________ Dated; C vOFFeEWW,N\WPOOCS\OEt*CO'S«)E»C09Z WPO

317 MADISON AVENUE • NEW YORK. NY 10017.212 922 1020 • FAX 212 349 9762

** TOTAL PAGE.02 **

NYC-WTC_000171342

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171342Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #88 submission, 7 WTC, June 1999 · Box 7DCAS

NYC-WTC_000168409

Contractor submits Change Order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.942

machine-extracted · confidence unavailable · Check page ↗
Change order #102 cover letter, Oct 29 1999 · Box 7DCAS

NYC-WTC_000171585

Ambassador Construction cover letter dated October 29, 1999 submitting change order #102 for data box and outlet installation at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.939

machine-extracted · confidence unavailable · Check page ↗
Change Order #62 memo, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000168507

Memo from Ambassador Construction submitting Change Order #062 for $9,679 to complete roofing details at a new curb on the 7 World Trade Center roof.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.937

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171340 · Box 7DCAS

Contractor submission for Change Order #93 to wire motor and switch controllers at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000168622 · Box 7DCAS

Ambassador Construction submits Change Order #023 for steel reinforcement and conduit penetration on the 7th floor.

Similar indexed content

NYC-WTC_000168409 · Box 7DCAS

Contractor submits Change Order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →