Change Order #15 sleeves, 7 WTC, Oct 1998

Machine-extracted title · confidence 95%

Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.

NYC-WTC_000168650–000168651

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #015 Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000168650
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

OCT 09 ’98 15=23 PR AMBASSADOR CONSTR. C0212 949 9762 TO 7325190 P.02/03

4 AMBASSADOR CONSTRUCTION CO, INC.

October 8, 1998 Mr. Walter Weems Silverstein Properties, Inc. 7 World Trade Center New York. NY 10048

RE. Mayor’s Office of Emergency Management 7 Worid Trade Center -1, 7 & 23rd Floors Change Order #015 Amb. Job #857-5175

Dear Mr. Weems;

We are pleased to submit herewith our change order #015 to perform the following work at the above referenced premises for the sum of TWENTY ONE THOUSAND TWO HUNDRED THIRTY FOUR DOLLARS ($21,234.00);

SCOPE OF WORK As per Swanke Hayden Connell's sketch for new sleeve location at 23rd Floor (attached), the foiiowing is our breakdown;

- (41) 4” through-wall sleeves @ $283.38 $11,619.00 - (4) 2" underfloor sleeves @ $141 00 564 00 ' 4” Stubs from ceiling to below raised floor at 15' of conduit with elbows 15 x 4=60' x $42.29 2,537.00 - Carpenter’s time for cutting, patching and firestopping of wall 3,100.00 - Cutting of raised floor panel 500 00 Subtotal $18,320 00 General Conditions 1,465.00 Overhead & Fee 1,187 00 Insurance 262 00 Total $21,234.00

Please notify us if we are to proceed with this work

We trust the above meets with your approval and we look forward to the continued pleasure of serving you.

Very truly yours,

INC

Martin Schneider Vice President

cc; Juan Mejia - SHC Glenn Pymento - DCAS

Accepted;_________ Dated c.\wt>ao«'0^0«mcol 5 WDdl

317 MADISON AVENUE, NEW YORK, NY 10017,212 9221020, FAX 212 949 9762

NYC-WTC_000168650

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168650Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #067 submission, 7 WTC, Feb 1999 · Box 7DCAS

NYC-WTC_000171464

Ambassador Construction letter dated February 10, 1999, submitting Change Order #067 for $2,694 to assemble cords, relocate speaker strobes, and provide circuits.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.961

machine-extracted · confidence unavailable · Check page ↗
Change Order #061 memo, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000168510

Memo from Ambassador Construction submitting Change Order #061 for $2,785 to wire auxiliary contacts to magnetic locks and rewire doors at 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.961

machine-extracted · confidence unavailable · Check page ↗
Credit change order #027, Nov 1998 · Box 7DCAS

NYC-WTC_000172201

Letter from Ambassador Construction submitting credit change order #027 for painting work at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.960

machine-extracted · confidence unavailable · Check page ↗
Memo submitting Change Order #039, Dec 1998 · Box 7DCAS

NYC-WTC_000171889

Ambassador Construction submits Change Order #039 for USM furniture and plates at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000174002 · Box 7DCAS

A transmittal letter submitting Change Order #54 for $2,670 for time and material work at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171870 · Box 7DCAS

Ambassador Construction submits Change Order #51 detailing height adjustments and unit additions to adjustable shelving units.

Similar indexed content

NYC-WTC_000171862 · Box 7DCAS

Submission of change order #048 to furnish and install a new 24x24 access door and hardware at room 23-51.

Similar indexed content

NYC-WTC_000168546 · Box 7DCAS

Memo submitting Change Order #51 for adjusting shelving heights and adding units on the 23rd floor.

Similar indexed content

NYC-WTC_000171464 · Box 7DCAS

Ambassador Construction letter dated February 10, 1999, submitting Change Order #067 for $2,694 to assemble cords, relocate speaker strobes, and provide circuits.