Revised Change Order #17 floor boxes, 7 WTC, Oct 1998

Machine-extracted title · confidence 95%

Revised Change Order #17 submitted by Ambassador Construction for floor box installation at 7 World Trade Center dated October 22, 1998.

NYC-WTC_000168638

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #017 Revised Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000168638
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

OCT 22 '98 12153 FR ANBR88AD0R CONSTR. C0212 949 9762 TO 7325190 P,02/02

AMBASSADOR CONSTRUCTION CO INC

♦ Mr Walter Weems Silverstein Properties, Inc. October 22, 1998

7 World Trade Center New York, NY 10048

RF. Mayor’s Office of Emergency Management 7 World Trade Center -1, 7 & 23rd Floors Change Order #017 Revised Amb. Job # S57-5175

Dear Mr. Weerns.

We are pleased to submit herewith our revised change order #017 to perform the following work at the above referenced premises for the sum of FIVE THOUSAND FORTY TWO DOLLARS ($5,042 00):

SCOPE OF WORK - Delete material cost for floor boxes in original layout <$3,930.00>

- Provide and install combination floor boxes under raised floor area as per Swanke Hayden Connell's memorandum dated October 13,1998. As per discussion with Swanke Hayden Connell, the under floor box will be by Raceway Component Inc. $8,280.00 General Conditions 348 00 Overhead and Fee 282.00 Insurance 62.00 Total $5,042,00

In order to perform this work, we must have an approval for this change order.

Please sign one copy of this letter and return it to our office so we may proceed

if you have any questions, please do not hesitate to contact us.

We trust the above meets with your approval and we look forward to the continued pleasure of serving you

Very truly yours,

coN^Ru^ioN inc

JMartnS^eider

Vice President

MSag cc Juan Mejia - SHC Glenn Pymento • DC AS

Accepted:______ Dated c \»paocswemle»mci,i 7 wpaj 317 MADISON AVENUE, NEW YORK, NY 10017, 212 922 1020, FAX 212 949 5762

TOTAL PAGE. 02

NYC-WTC_000168638

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168638Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Revised Change Order #80, 7 WTC, April 1999 · Box 7DCAS

NYC-WTC_000168434

Contractor submits a revised Change Order #80 for $1,631 to remove additional floor granite interfering with fuel oil piping.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.950

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171986 · Box 7DCAS

Ambassador Construction submits revised change order to install combination floor boxes under the raised floor at 7 World Trade Center.

Filed in the same folder

NYC-WTC_000168622 · Box 7DCAS

Ambassador Construction submits Change Order #023 for steel reinforcement and conduit penetration on the 7th floor.

Similar indexed content

NYC-WTC_000172009 · Box 7DCAS

Ambassador Construction details scope and cost for installing a stainless steel package receiver at the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →