NYC 9/11 Public Portal Document
P.02/02
OCT 22 00^43 FR snmsSOOOR CO6TR. 00212 0762 TO 7325190
AMB^SADOR CONSTRUCTION CO.. INC.
October 21,1998
Mr. Walter Weems
Silverstein Properties, Inc.
7 World Trade Center
New York. NY 10048
I
RE. Mayor’s Office of Emergency Management
7 World Trade Center 1, 7 & 23rd Floors
Change Order #020
Amb. 4Ak#.S57-5l75
Dear Mr. Weems:
We are pleased to submit herewith our change order #020 to perform the following work at the
above reference premises for the sum of TWELVE THOUSAND EIGHT HUNDRED SIXTY
SIX DOLLARS ($12,866.00)
SCOPE OF WORK
In response to RFI#33, provide power for fan power boxes at 277volts from new circuits.
Work includes removing wiring already in place back to the source. The circuitry to be
removed is PM-23-M1 #*8 37. 39,41, and 38 and PP-23-M2 #14,16 and 46. Wire fans to
existing circuits #EHP-23C #’s 4, 3 and 11 and EHP'23B #7 and 4 and a new circuit from
panel #EHP-23C #16. Alt work must be performed through existing finish ceilings.
Electrical $8,600.00
Ceiling. Cut & Patch 2.500.00
General Conditions 888.00
Overhead S Fee 719.00
Insurance 159.00
Total $12,866.00
Please approve this change order so we may proceed.
Very truly yours,
^^AS^DOR C^NS/RUOTON CO., INC.
Xiartin Schneider
Vice President
MS’.ag
cc; Juan Mejia - SHC
Glenn Pymento * DCAS
Accepted; Dated:
322 1020, FAX 212 S49 9762
TOTAL PAGE.02 +*