← Document results/7DCAS/7 World Trade Center Mayor's Office of Emergency Management -1st, 7th, & 23rd Floors Change Order #52
Document / 3 pages

Change Order #52, 7 World Trade Center, Jan 1999

Machine-extracted title · confidence 95%

Memo submitting Change Order #52 for removing outlets and installing new circuits in the Commissioner's Office at 7 World Trade Center.

NYC-WTC_000168538–000168540

Folder label: “7 World Trade Center Mayor's Office of Emergency Management -1st, 7th, & 23rd Floors Change Order #52

Page image
Scanned page image, NYC-WTC_000168538
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Si!v< r:,(r.in Propc/tic.i ' Wuriu I -Htili ‘f I..''' ilKwH , ,„| H',' HIM G'J.u

January 19, 1999

Mr. Glenn Pymento Department of City Wide Administrative Services Division of Real Estate Services 1 Centre Street, DRES - Room 2000 North New York, New York 10007 RE: 7 World Trade Center Mayor's Office of Emergency Management-V ‘, 7*, & 23''^ Floors Change Order #52 Dear Mr. Pymento:

Attached please find change order #52. in the amount of $38,987.00 submitted by Ambassador Construction for the following scope of work:

1. Robert B. Samuels' Work Order #28485: In room 23-15 (Commissioner's Office), remove and cap (4) floor and (4) wall outlets, extend (2) separate circuits and furnish and install (4) outlets on column and (5) outlets on wall as requested. Patch walls, floors and paint.

Electric cost $1,283.00 Sheetrock Patch $500.00 Paint $250.00 Flooring $100.00 Subtotal $2,133.00 General Conditions $171.00 Overhead and Fee $138.00 Insurance $31.00 Total $2,473.00

2. Robert B. Samuel's Work Order #28486: In watch command area 23-52, remove and reassemble the Motorola furniture and relocate the receptacles so they layout under the furniture as requested. Reset and reassemble furniture, flooring and carpet work. Some of the electrical work was performed on overtime.

Electric Cost (Straight time) $7,664.00 Electric Cost (Overtime) $6,088.00 Material $578.00 Patching Floor and Carpet $500.00 Subtotal $14,830.00

NYC-WTC_000168538

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168538Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order #109 cover letter, Jan 7 2000 · Box 7DCAS

NYC-WTC_000171564

Ambassador Construction cover letter dated January 7, 2000 submitting change order #109 for door lock and electrical work at the Mayor's Office of Emergency Management.

1 shared non-person entities · Same agency, volume and box · similarity 0.950

machine-extracted · confidence unavailable · Check page ↗
Change order submission memo, Jan 2000 · Box 7DCAS

NYC-WTC_000168349

Letter submitting change order #109 for door lock repairs and electrical installations at the Mayor's Office of Emergency Management.

1 shared non-person entities · Same agency, volume and box · similarity 0.949

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168534 · Box 7DCAS

Memo submitting Change Order #53 for mounting computer equipment and patching cables in the lan room at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168541 · Box 7DCAS

Memo submitting Change Order #52 for capping outlets and installing new circuits in the Commissioner's office.

Similar indexed content

Compare copies and versions →