Same-box records
Change order #082 memo for blast-resistant door installation, April 1999 · Box 7DCASNYC-WTC_000172150
Memo submitting change order #082 to replace existing door and hardware with a blast-resistant door in the radio room.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.982
Credit Change Order #84, 7 WTC, April 1999 · Box 7DCASNYC-WTC_000168425
Contractor submits a credit change order for $30,681 to eliminate eight TV monitors and adjust lighting fixtures at the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.981
Change Order #49 for ceiling tiles and sprinklers at 7 · Box 7DCASNYC-WTC_000168552
Memo submitting Change Order #49 to provide ceiling tiles and relocate sprinkler heads in the press room.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.980
Revised Change Order #024R submission, Nov 1998 · Box 7DCASNYC-WTC_000171914
Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.977
Change Order #082 for blast door installation, 7 WTC, Apr · Box 7DCASNYC-WTC_000173903
Ambassador Construction submits Change Order #082 for $8,313 to replace a hollow metal door with a blast-resistant one at 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.977
Memo specifying LAN backbone runs for 7 World Trade Center, · Box 7DCASNYC-WTC_000171359
Technical specifications for installing fiber optic and UTP cable backbones between LAN rooms at the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.976
Credit Change Order #84 for TV monitors and lighting, April · Box 7DCASNYC-WTC_000172362
Ambassador Construction submits Credit Change Order #84 for $30,681 regarding elimination of TV monitors and installation of wall wash fixtures.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.975
Change Order #067 submission, 7 WTC, Feb 1999 · Box 7DCASNYC-WTC_000171464
Ambassador Construction letter dated February 10, 1999, submitting Change Order #067 for $2,694 to assemble cords, relocate speaker strobes, and provide circuits.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.975
Memo submitting Change Order #47 for generator flexes, Dec 1998 · Box 7DCASNYC-WTC_000171882
Ambassador Construction submits Change Order #47 for stainless steel generator flexes to address height restrictions at 7 World Trade Center.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.975
Change Order #54 submission for 7 WTC OEM work, Jan · Box 7DCASNYC-WTC_000174002
A transmittal letter submitting Change Order #54 for $2,670 for time and material work at 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.975
Change Order #46, 7 World Trade Center, Jan 1999 · Box 7DCASNYC-WTC_000172216
Submission of Change Order #46 for $2,168 to provide power supply in room 23-50 at 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.974
Change Order #46 for power circuits, 7 WTC, Dec 1998 · Box 7DCASNYC-WTC_000168561
Ambassador Construction submits Change Order #46 to provide power supply and security equipment circuits at 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.974