NYC 9/11 Public Portal Document
AUG 02 199911216FR AMBASSADOR CON. TO SPI 7 WTC P.02/02
. OTSS31Nl_Ag50CI*TJiS Mgooz
•J
ASSOOATKSIXraTWOfKKM.TUZA. NEW YORK, MY IMW ■ ■ 7AX2U^S47M
JOB MEMORANDUM
TO: JoeAlrotU SUBJECT: [email protected].
yGEBVE
FROM: RonPincott
JOB NO: 1854
AUG 2 1999
CC; M. Maybaui fey
J. Dwyer DATE: July 6,1999
V. Lemeshev—
RB: 7di Floor Domestic Booster System Bearing Drips
We have reviewed the domestic water booster system located on die 7th floor with die st^pUer
of the system. The jJump provided has bearinga that arc v^der cooled. Thia discharge is very
limited in flow. To climinato the problem of getting rid of this water, we propose die use of an
antomatic pump and collection tank unit This unit will be installed adjacent to the pomp
package a^ will sit on the waterproofed floor.
The pump unit shall be:
• Federal Pun^ Coiporation model AITV automatic unit
• Heavy duty lO gallon
• Pmiip; 1/3 h.p. 1750 RPM
-Single phase 60 eye. It 5 volt with cord and plug
-20 GPM-10 ft. hd.
>2" inlet - 1" discharge
Provide 2“ trq? and funnel on tank inlet for proposed I.W. flom bearing mis of domestic pump
system. Cotmect pump discharge pipe to the existing strap pump discharge pipe at the corridor
wall. Provide check vidve and shi^ff valve in discharge piping.
A120V 30 amp receptacle shaU be provided at die locatioa of die new pump for plug in
connection. This shall be coordinated with the electrical contractor.
We am reviewing die building alternate to die self coateined pixunp and tank unit
XAiWFntBnus4AMiKMmoeuoi
•lU. 07 ’99 10547
2122190256 PAGE.02
** total page.02 **
NYC-WTC_000168401
OCR can misread numbers and units. Confirm readings against the page image before using them.