NYC 9/11 Public Portal Document
FRT IS Sa FAX 212«45«»«z
AMBASSADOR tdooz
From: Proterrea UlU i . LiC NY To: Oon»W Murphy Dslc. 2/10/00 Time: 11:50:12 AM Psge 2 er e
FAX DOCUMENT
j Utilities Manufacruring Corp
129-02 Northern Boulevard Corona. N. Y. 11368
Phone 718-424-3350 Fax 718-424-3577
Date: 2/iW)
3 PageCs) total
• Kaback Enit rpriscs, Inc.
. tn: Donald Murphy
■ f. Mayors Odke-7 World Trade Center
■xrOoiMld,
' i pw our inceltng last week at the 7 World Trade Center job-site, plcstse note the following
minenis and suggestions.
•lOn visual ins|5ection of the system layout, I recommend the following changes.
The Anti Syphon Valve should be removed from the pump suction pipe
A check valve should be insuillcd as close to the tank inlet as pos-sible. This check valve
will help ke sp the suction line primed (A review of the existing job fries for iliis particular
building die not conCnP the existence of a foot valve in the supply line).
One item 11 lid not notice was whether all of the pump sets had cheek valves on tlwir
respective '.action pipe. Ifnot, 1 recommend installation of a chock valve on each. This
will preven the siphoning effect from any of the sets when any one or more of the units
are in the a n mode.
■ I The 2" sudiO.T pipe diameter is sulTeient for the sinidlcr pump sets (total 1.189 GPH)
dunng nontal fill Operation, as well as the tenant lank fill pump set (l.lXX) GPH). Wc
supplied in crlccks on our tenant rank fill pump sei IO prevent the pump .set from
fonctionirtf: siniulUneously with the other sets. This will reduce the required diameter for
ibc auction pipi;. The existing 2” supply line will require approximately 11.24” Hg. of lift
for the eith x the tenet set or the three .smaller sets combined.
^ne other issue:
n regards to n y observation of the leak sensors mounted inside the 55-gal Ion drums: Thu
.-ak sensors sliouki be removed iiruncdieicly. AS installed this application could be a possible
xpluaion hazard-
4ount units through the wall from outside as near the bottom ofthe cwm as possible. Punch a
lolc in the dm T. then weld (complete) the boss in place. The switch is screwed through the
loss for the pt spet lever action.
f you have ary further questions please don’t hesitate to call.
Best Regardi,
Preferred Utilities Manulaciuhng Corp.
Jolin F. Haber
COMBUSTION AND CONTROL FOR. OVER SEVENTY FIVE YEARS
FEB 11 2000 16:59
2126458962 P9GE.02
** TOTAL PAGE.04 **
NYC-WTC_000168340