NYC 9/11 Public Portal Document
10/21/97 TUE 12:27 FAI 212 738 3519 COSENTINI ASSOC. 0004
Mr. Joseph Alioita
Swanke Hayden Connell, Ltd.
October 17. 1997
Revised October 21, 1997
Page - 3 -
CoMnlini Astodatn UP
Corawking Engmeen
Schematic Design Scope of Work
A. Engineer and Client (and Client designated team members) come to
agreement as to the MEP requirements of the project based on Engineer
reconunendations.
B. Document the MEP requirements.
C. Ascertain the feasibility of achieving the requirements within the
building/space and recommend changes and/or inaprovements.
D. Coordinate system requirements and details with team members.
E. Provide schematic plans for budgeting by others.
F. Identity long lead items.
G. Complete schematic design information and documents in accordance with
project schedule.
Q Documents Phase Scope of Work
A. Provide contract drawings, specifications, and information schedulcs
coordinated with design team members, all in conformance with project
schedule.
B. Entire project will be prepared on CADD equipment compatible with
architects systems and discs will be provided for clients fiiture use.
C. Prepare final construction documents for filing purposes.
D. Prepare documents for filing by Building Department Expeditor.
E. Coordination of all work with outside consultants (retained by others.)
N«w York Wcsniricii-"*' T'C'