NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center, 23rd Floor Structural Engineering Services
Document / 2 pages

Fee proposal for structural engineering services, Dec 1997

Machine-extracted title · confidence 95%

Fee proposal from The Cantor Seinuk Group P.C. for structural engineering services at the Mayor's Office of Emergency Management.

NYC-WTC_000167235–000167236

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center, 23rd Floor Structural Engineering Services

Page image
Scanned page image, NYC-WTC_000167235
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SENT BY: 12-18-97 :10:28AM : CANTOR SEINUK GROUP-^ 2190059:# 2/ 3

•• THE CANTOR SEINUK GROUP P.C.

600 MADISON AVENUE . NEW YORK. NEW YORK 10022 . TEL (212) 755-4242 • FAX (212) 752-6024

December 17,1997

Mr. J. J. Aliotta Swanke Hayden Connell Architects 295 Lafayette Street New York, N.Y. 10012

RE: Mayor's Office of Emergency Management 7 World T rade Center, 23rd Floor Structural Engineering Services

Dear Mr. Aliotta:

Thank you for your invitation to submit a fee proposal for structural engineering services relative to the above noted project.

Per our discussion and from the schematic drawings we received, we understand the scope of work include.^ the following:

1. Provide structural engineering associated with a new mechanical space at 7th floor (including structural support for switch gear, generators and water tank ).

2. Provide structural engineering associated with slab penetrations from 7th floor to Roof due to mechanical coordination.

> 3. Provide structural review for new loads imposed on the existing structure of the 23rd floor and provide reinforcement as required.

. 4. Provide structural engineering associated with a new Radio room at roof.

> 5. Provide structural engineering associated with a new fuel oil storage.

6. Provide documents suitable for bidding and construction.

7. Provide construction administration phase services ( shop drawing review and field question resolution ).

PROF. V6RAEL A. SBNUK, Pi, FACi OB* FXCi. CMMT GMiflW Otar . MMN a CANrOR. Pi, FACX. FAiCi, PtwUM aK.VMN*MNOUa.Pa,e«eUfMMMAMMMt* aSTAMnUAOSACCBXXFSt aMto-MMPMM AMMU>nA»«MMN.Fa.MMAHMM. jOTWrmOWtPi, MwAwMM

NYC-WTC_000167235

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000167235Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →