FEB. 6. 1996 10:42AM SWANKS HAYDEN CONNELL ARCHITECTS NO. 3085 P. 5/8 SWANKE HAYDBN CONNELL ARCHITECTS

Fax Message

Re From Mayo)'’s Office of Emergency Management Joseph J. Aliotta Emeri ency Optratiemj Center-? World Trade Center Job No, Pages 5576A 3 ' Dale Time 01/28/98 (Wed) 1:23PM

Dhtribut on: (Pletie deliver to p«rsoi»(s) indicated by ) ! SUventei^ Properties, Inc. (212)732-1207 DCAS/DRES (212)669-3640 OEM (212)442-8885/9266 0 Ms. Carine Giliberii ’Z Mr. Josep Dominguez 4 Mr. Patrick Ronan O Mr. Chi Chu (212)687-0067 0 Mr. Vinicius Caslagnola Q Mr. Jerome M. Houer Essential Technologies (301)733-1026 Cosentini Associates (212)615.3700 Shen Milsom (212) 725-0^64 0 Ms. Mferrily Powell O Mr. Michael Maybaum O Mr. Ernest J. Schinner I I O Mr. Robert Slavik I ! I BFI (212)679-2201 RSA (212) 633-1613 SHCA O Mr. R6b Willard O Mr. Robert Schwartz O Mr. Carl Meinhardt 0 Mr. Ri^ Cocum O .Mr. John VantkPlasse < Message

Attached please find the consultant proposal for security by Vikonics, Inc, dated 0 IZ27,^8 for your review and approval.

A compai'ison of this proposal and the sample proposal given to Vikonics is as follows;

Item#!; Vikonics will not produce a report outlining their design concepts in response to development of a program [ by working with OEM. It appears Vikohics will produce a schematic design directly for your review ami I approval. Vikonics needs to clarify whether their Bill of Materials will also include estimates of I construction costs associated with equipment not supplied by Vikonics. Item #2; ! Vikonics needs to Clarify whether they will provide an outline specification or whether foe Bill of Materials will provide sufficient descriptive security design information for OEM and the SHCA design team to ; review and coordinate foe security equipment. ' Item#3,4,5: Vikonics to clarify that device matrix indicated is a full security hardware schedule. No mention is given to full security specifications describing the required performance, function and intent of systems to be procured; description of work; installation performance and quality; coordination of work by others; eteJ Item#?: Vikonics makes no reference to punchlisting and testing of system. No reference to as-built drawings i provided to OEM at end of project. I This proposal is specifically based upon the fact that Vikonics will be the only bidder and the only security expert onl board to determine whether the design and equipment provided is of acceptable quality in comparison to the accepted bid. Shoind OEM proceed with this course of action, the purchase order should be carefully worded in terms of expected quality, performance, testing, warranly, service contract, etc. '

Please review foe above comments and the attached proposal and provide SHCA with your comments and direction, i Upon yoi r review, comments and approval, SHCA will retain Vikonics as an consultant. j SHCA looks forward to heariiigdfeQtftyQtt'^Jdfe?rt?#u4#^ 219-6716 ;

Swank* Hayden Connell Ltd- 295 Lafayette Street, New York, New York 10012 (212) 226-9696, Fax (212) 219-0059 VV:\5676\A\Oemdocs\Fax\Dist Fax-Security 01-2a-98.D0c NYC-WTC_000167224

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000167224Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Fax transmission log, Feb 1998 · Box 7DCAS

NYC-WTC_000167216

One-page fax transmission log for documents regarding the Mayor's Office of Emergency Management project identified by document number NYC-WTC_000167234.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.962

machine-extracted · confidence unavailable · Check page ↗
Meeting record, OEM project, Jan 1998 · Box 7DCAS

NYC-WTC_000170874

Record of a meeting involving the Mayor's Office of Emergency Management and construction contractors at 7 World Trade Center.

3 shared non-person entities · Same agency, volume and box · similarity 0.871

machine-extracted · confidence unavailable · Check page ↗
Design review correspondence for OEM, Feb 4, 1998 · Box 7DCAS

NYC-WTC_000167741

Cover letter transmitting a memo regarding design specifications for the Mayor's Office of Emergency Management at 7 World Trade Center to City officials.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.871

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Fax transmission log, Feb 1998 · Box 7DCAS

NYC-WTC_000167216

One-page fax transmission log for documents regarding the Mayor's Office of Emergency Management project identified by document number NYC-WTC_000167234.