FEB. 6. 1996 10:42AM SWANKS HAYDEN CONNELL ARCHITECTS NO. 3085 P. 5/8
SWANKE HAYDBN CONNELL ARCHITECTS
Fax Message
Re From
Mayo)'’s Office of Emergency Management Joseph J. Aliotta
Emeri ency Optratiemj Center-? World Trade Center Job No, Pages
5576A 3
' Dale Time
01/28/98 (Wed) 1:23PM
Dhtribut on: (Pletie deliver to p«rsoi»(s) indicated by ) !
SUventei^ Properties, Inc. (212)732-1207 DCAS/DRES (212)669-3640 OEM (212)442-8885/9266
0 Ms. Carine Giliberii ’Z Mr. Josep Dominguez 4 Mr. Patrick Ronan
O Mr. Chi Chu (212)687-0067 0 Mr. Vinicius Caslagnola Q Mr. Jerome M. Houer
Essential Technologies (301)733-1026 Cosentini Associates (212)615.3700 Shen Milsom (212) 725-0^64
0 Ms. Mferrily Powell O Mr. Michael Maybaum O Mr. Ernest J. Schinner I
I O Mr. Robert Slavik
I
! I
BFI (212)679-2201 RSA (212) 633-1613 SHCA
O Mr. R6b Willard O Mr. Robert Schwartz O Mr. Carl Meinhardt
0 Mr. Ri^ Cocum O .Mr. John VantkPlasse <
Message
Attached please find the consultant proposal for security by Vikonics, Inc, dated 0 IZ27,^8 for your review and approval.
A compai'ison of this proposal and the sample proposal given to Vikonics is as follows;
Item#!; Vikonics will not produce a report outlining their design concepts in response to development of a program
[ by working with OEM. It appears Vikohics will produce a schematic design directly for your review ami
I approval. Vikonics needs to clarify whether their Bill of Materials will also include estimates of
I construction costs associated with equipment not supplied by Vikonics.
Item #2; ! Vikonics needs to Clarify whether they will provide an outline specification or whether foe Bill of Materials
will provide sufficient descriptive security design information for OEM and the SHCA design team to ;
review and coordinate foe security equipment. '
Item#3,4,5: Vikonics to clarify that device matrix indicated is a full security hardware schedule. No mention is given to
full security specifications describing the required performance, function and intent of systems to be
procured; description of work; installation performance and quality; coordination of work by others; eteJ
Item#?: Vikonics makes no reference to punchlisting and testing of system. No reference to as-built drawings
i provided to OEM at end of project. I
This proposal is specifically based upon the fact that Vikonics will be the only bidder and the only security expert onl
board to determine whether the design and equipment provided is of acceptable quality in comparison to the accepted
bid. Shoind OEM proceed with this course of action, the purchase order should be carefully worded in terms of expected
quality, performance, testing, warranly, service contract, etc. '
Please review foe above comments and the attached proposal and provide SHCA with your comments and direction, i
Upon yoi r review, comments and approval, SHCA will retain Vikonics as an consultant. j
SHCA looks forward to heariiigdfeQtftyQtt'^Jdfe?rt?#u4#^ 219-6716 ;
Swank* Hayden Connell Ltd-
295 Lafayette Street, New York, New York 10012
(212) 226-9696, Fax (212) 219-0059
VV:\5676\A\Oemdocs\Fax\Dist Fax-Security 01-2a-98.D0c