Re MAYORS OFFICE OF EMERGENCY MANAGEMENT JOB# 867-6176 TIMELINE
| .
BASED ON THE CONSTRUCTION SCHEDULE FOR THE 23°. FLOOR AT 7 WORLD TRADE
CENTER THE NETWORK INFRASTRUCTURE INSTALLATION IS AS FOLLOWS;
1) DELIVER MATERIAL TO SITE SEPT. 4
2) PULL CABLES IN TROUGH AND ROUGH SEPT, & NOV. 12
3) DRESS CABLES AND TERMINATE AT STATION END NOV,12-DEC. 4 -
4) BUILDI.D.FS AND M.D.F. OCT. 30-DEC4
6) TEST AND LABEL DEC. 4-DEC,16
&) DOCUMENTATION DEC, 16 JAN, 1
REQUIREMENTS;
1) MATERIAL DELIVERY:
NEED TO HAVE A ROOM OR AREA ASSIGNED FOR MATERIAL STORAGE
ort LY byte? PAWs ePAiorens Fb Ke
THIS TIME ( 611) I6 DEPENDANT ON ELECTRICAL AND FLOORING
_ CONTRACTORS TO BE ON SCHEDULE, COORDINATION WILL BE ESSENTIAL BETWEEN
*pase
NYC-WTC_000166772
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000166772Source: NYC Law Department, mirrored locally
Page containing illegible text or symbols, likely a damaged or scanned fragment from the Mayor's Office of Emergency Management records at 7 World Trade Center.