NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Proposal for Full Comprehensive MEP Engineering Services for Forest City Tech Place Associates
Document / 127 pages

Proposal for MEP engineering services dated May 6, 1992

Machine-extracted title · confidence 90%

Formal proposal document dated May 6, 1992, outlining MEP engineering services provided by an architectural firm.

NYC-WTC_000166571–000166697

Folder label: “Proposal for Full Comprehensive MEP Engineering Services for Forest City Tech Place Associates

Page image
Scanned page image, NYC-WTC_000166695
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

John Forcina, EIT Mechanical Engineer TKLP Education Bachelor of Science, Commerce and Engineering, Drexel University, 1987

Registration EIT, Plumbing / Process Piping Engineer: Pennsylvania

Years Experience With TKLP: 4 With Other Firms: 0

Respcmsibilities As project engineer, Mr. Forcina will be responsible for all plumbing and fire protection issues for specific buildings. A part of his responsibilities will include coordinating his work with the other engineering disciplines, and to make sure the designs adhere to all applicable codes and regulations.

Reason Selected Mr. Forcina has experience in the design of plumbing and fire protection systems on a vari­ for Bus Project ety of projects for foe public and private sector. These include:

Relevant Merrill Lynch & Co., Staten Island, NY Experience/ A/E design and documentation of 130,000 SF, high-reliability and high security computer Qualifications center at Teleport to back up Merrill-Lynch's computer operations worldwide. Preaction sprinklers, wet pipe sprinklers and Halon 1301 provide fire protection for foe facility.

Drexel University, Philadelphia, PA A/E design and documentation of a 66,800 SF, five-story engineering laboratory building. Involved in the design, synthesis and testing of composite materials in metallurgy, polymer science and ceramics. Also included are CADD and other computer facilities. Wet pipe sprinklers and dry pipe sprinklers, aided by a centrifugal fire pump, protect the facility.

Thomas Jefferson University, Philadelphia, PA Architectural/engineering design, documentation, and construction administration for foe Lewis W. Bluemle, Jr. Life Sciences Building, a 289,000 SF medical laboratoiy building dedi­ cated to research and teaching in the fields of biochemistry and microbiology. Design included total flooding carbon dioxide along with preaction, wet pipe and dry pipe sprinkler systems aided by a centrifugal fire pump to protect the facility.

Mr. Forcina has participated on risk analysis sessions and was the fire protection and plumb­ ing engineer for Reliability Programs for foe following projects:

Morgan Stanley & Co., Inc., Brooklyn, NY 90,0(X) SF of computer equipment and machine space. Fire protection included Halon sys­ tems and Preaction sprinkler system.

Morgan Stanley & Co., Inc., New York, NY 25,000 SF data center converted to a disaster recovery site with Halon as primary fire protec­ tion.

Forest City Tech Place Associates for Full Engineering Services 05/06/92 [P2371 B-23

NYC-WTC_000166695

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166695Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →