NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
NYC-WTC_000166488–000166533Folder label: “NYC DOB WTC Building Code Task Force Findings and Recomendations - Feb. 2003”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
5.6 Proposed Requirements for Fuel Oil Storage and Supply of Emergency Power Systems
5.6.1 Fuel Oil Transfer Piping to Day Tanks Requirement: Fuel oil transfer piping to day tanks should be limited in diameter. Commentary: The size of fuel oil tanks ("day tanks") above the lowest level of a building is limited to a capacity of 275 gallons. There have been reports of 12 inch diameter fuel oil piping installed to tanks on upper floors in buildings. One foot of 12 inch diameter pipe has a volumetric capacity of about 5.8 (' gallons. Thus, 47 feet of 12 inch pipe would equal 275 gallons. Obviously the use of a 12 inch pipe is intended to provide reservoir capacity in excess of the 275 gallon limitation. Unfortunately, the Building Code, as presently written, would not prohibit , the use of such oversized fuel oil transfer piping.
5.6.2 Proposed Requirements on Fuel Oil Header Pipe Installations ! To be inserted into Article 17 27-829 (b) "exceptions."
Piping used for distribution of oil to fuel burning equipment. Where piping is utilized for means of distributing fuel oil to equipment, without the use of a day. tank, and where the piping is upsized to provide a storage capacity, the following requirements shall apply. 1. All piping shall be suitably supported so as to not allow overstressing of piping and shall be suitable isolated from rotating equipment. 2. All piping shall be schedule 40 steel. 3. Connections to main header (supply or return) shall be via the top of the pipe. 4. All fittings to header pipe and equipment shall be welded. 5. Fittings for immediate shut off valves to equipment shall be screwed or flanged. 6. Where air vents or vacuum breakers are required they shall be designed for the required use. 7. All air vents and vacuum breakers shall be hard piped to a local 55 gallon drum, with a leak sensor alarm tied into a central alarm monitoring location. J
5.7 Proposed Revisions to Fire Protection and Egress Requirements
5.7.1 Exit Signs Section 27-228.05 of article 26 of subchapter 1 administration and enforcement of chapter one of title twenty-seven of the administrative code is identified as paragraph (a) and new paragraph (b) is added as follows: §[C26-125.1] 27-228.05 General Requirements. (b) Owners of all existing buildings which are required to comply with paragraph fc) of section . 27-383 (exit signagel shall File with the department a report prepared by a registered architect or professional engineer certifying to the installation of the required exit signage no later than one year from the effective date of this law.
Page 44 WTC Building Code Task Force February 2003 Findings and Recommendations
NYC-WTC_000166530
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141695
Section of an environmental assessment describing existing physical conditions and construction impacts at the World Trade Center site.
4 shared non-person entities · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
2 shared non-person entities · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141585
Map showing the condition of buildings at the World Trade Center site as of September 21, 2001.
9 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
4 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168718
Document outlining fire evacuation procedures and objectives for 7 World Trade Center.
3 shared non-person entities · 1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173475
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
6 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
7 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0139.
Cited alongside this record in an Ask answer