NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
NYC-WTC_000166488–000166533Folder label: “NYC DOB WTC Building Code Task Force Findings and Recomendations - Feb. 2003”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
(
( The size of fuel oil tanks ("day tanks") above the lowest level of a building is currently limited to a I capacity of 275 gallons by the Building Code. In some instances, 12-inch diameter fuel oil transfer piping has been installed to provide reservoir capacity in excess.of the 275 gallon limitation. Because this size piping can quickly introduce an increased amount of fuel over multiple floors fuel oil transfer piping to day tanks should be limited in diameter.
In most cases, individual tenants install dedicated emergency generating plants consisting of multiple engine/generator sets. These electrical generating plants are necessarily located in proximity to the tenant space they serve. Re-circulating fuel oil systems are used to pump oil from a tank on the lowest level of the building to a header that allows each of the engines/generators to take the needed amount of fuel oil with the rest returning to the tank. Currently, nothing in the Building Code regulates the assembly and use of these systems. As with day tanks, the Building Code should strike a balance between the amount of fuel oil that can safely circulate through a building and that needed for appropriate emergency energy generation. It is recommended that when fuel oil re-circulating systems are used to provide fuel oil to emergency generators on upper floors, fuel oil headers not exceed 12 inches. Such headers shall be limited to the length required for the specific emergency generator installation, with diameter limits placed on the header and the supply and return lines to and from the fuel tank. Additionally, pipe material, connection location, emergency shut off valve, and joint welding specifications have been made. In some instances oversized piping is used for distribution of oil to emergency generators. Modern equipment design often relies on the recirculation of fuel oil in these distribution pipes for cooling making them necessary for emergency generation. The following standards are proposed where piping is utilized as a means of distributing fuel oil to equipment, without the use of a day tank (to be inserted into Article 17 27-829(b) "exceptions."): ( ! • All piping shall be suitably supported so as to not allow overstressing of piping and shall be suitably isolated from rotating equipment. • All piping shall be schedule 40 steel. • Connections to main header (supply or return) shall be via the top of the pipe. • All fittings to header pipe and equipment shall be welded. • Fittings for immediate shut off valves to equipment shall be screwed or flanged. • Where air vents or vacuum breakers are required they shall be designed for the required use. • All air vents and vacuum breakers shall be hard piped to a local 55 gallon drum, with a leak sensor alarm tied into a central alarm monitoring location.
Recommendation 15. Limit diameter of fuel oil transfer piping in systems using day tanks.
16. Implement standards for piping that is utilized to distribute fuel oil to equipment without the use of a day tank.
L February 2003 WTC Building Code Task Force Page 25 Findings and Recommendations
NYC-WTC_000166511
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141695
Section of an environmental assessment describing existing physical conditions and construction impacts at the World Trade Center site.
4 shared non-person entities · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
2 shared non-person entities · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141585
Map showing the condition of buildings at the World Trade Center site as of September 21, 2001.
9 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
4 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168718
Document outlining fire evacuation procedures and objectives for 7 World Trade Center.
3 shared non-person entities · 1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173475
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
6 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
7 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0139.
Cited alongside this record in an Ask answer