Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
NYC-WTC_000166488–000166533Folder label: “NYC DOB WTC Building Code Task Force Findings and Recomendations - Feb. 2003”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
I Recommendation 6. Improve marking of the egress path, doors and stairs with photo- luminescent materials and retrofit existing exit signs with either battery or generator backup power
4.2.3 Planning and Training for Evacuation The current NYC building and fire code requirements for occupancy group E, relative to evacuations in the event of a fire, has consistently protected the safety of New Yorkers over the decades. With regard to fire related emergencies, present evacuation requirements will remain unchanged. However, the possibility of other unforeseen catastrophic events must be addressed relative to evacuation. i The Working Group discussed and determined there was a need for mandated, non-fire related full evacuation plans. Currently partial evacuation plans and fire drills are required. This type of planning and training will also help to confirm the use and availability existing egress paths such as doors, stairs and roofs. Many building owners and managers have already begun full evacuation planning and training. The Task Force recommends a requirement that all high rise office buildings (occupancy group E) have full evacuation plans for non-fire related events.
Recommendation 7. Mandate a full building evacuation plan for non-fire related events.
4.2.4 Auxiliary Systems Auxiliary egress systems and technologies that support and reinforce customary systems were also discussed. Included in considerations were built systems such as fire towers and protected vestibules at elevator lobbies along with new technologies such as so-called "Phase III" elevators. The use of fire towers, an option in the current NYC Building Code, is in practice, discouraged because the fire tower's floor area must be included as a part of the floor area ratio (FAR), a calculation of a building's maximum floor area. A fire tower's area is counted as floor area, like occupied space. To make the option of constructing fire towers more appealing, the Task Force i recommends a FAR "subtraction" for fire towers. Buildings that include a fire tower should be allowed to discount the floor area of the fire tower in the FAR permitted for development. This recommendation would require a change in the Zoning Resolution and would have to be made in conjunction with the Department of City Planning. The mandating of protected vestibules at elevator lobbies was viewed favorably by the Emergency Evacuation Working Group. Proposed legislation is included in the appendix.
Elevator evacuation is counter to the current standard restricting the use of elevators during an emergency. Fire fighters and rescue personnel use elevators, during both fire and non-fire emergencies. New technologies currently under development to build "Phase III" (waterproof and smoke proof elevators suitable for use during emergencies) were discussed. Making recommendations for the use of this nascent technology now, or in the near future, was seen as premature by the Working Group. NIST will be studying this issue.
February 2003 WTC Building Code Task Force Page 21 Findings and Recommendations
NYC-WTC_000166507
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141695
Section of an environmental assessment describing existing physical conditions and construction impacts at the World Trade Center site.
4 shared non-person entities · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
2 shared non-person entities · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141585
Map showing the condition of buildings at the World Trade Center site as of September 21, 2001.
9 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
4 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168718
Document outlining fire evacuation procedures and objectives for 7 World Trade Center.
3 shared non-person entities · 1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173475
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
6 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
7 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0139.
Cited alongside this record in an Ask answer