NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
NYC-WTC_000166488–000166533Folder label: “NYC DOB WTC Building Code Task Force Findings and Recomendations - Feb. 2003”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
4 Findings and Recommendations I II
4.1 structural Strength
4.1.1 Progressive Collapse The current NYC code provisions for resistance to progressive collapse (see Appendix A) were k drafted in response to the collapse of a concrete panel and slab construction in Ronan Point England in 1968. The NYC Building Code progressive collapse provisions were adopted by rule into the current code on August 2, 1973. However, they are considered cumbersome to read and difficult to use by the engineering community. The Structural Strength Working Group developed a draft progressive collapse guideline to clarify these rules. Because it was unable to test these guidelines against actual buildings under design, these guidelines will be jsublished in this report for further development and testing. The draft provisions, which take much of their substance and methodology from the British Standard and Building Regulations Approved Document A, outline three methods of designing a structure for improved resistance to progressive collapse. The British Standard served as a model for this group because of its simplicity and nearly thirty years of satisfactory performance in various exceptional events. It should be noted that the performance of this standard is solely based on empirical evidence. Because the existing rules remain effective, these guidelines are meant to augment the. professional's ability to achieve a robust design for buildings at risk of extraordinary events. They are to be considered one possible approach. The Task Force recommends the development of coherent and rational standards through the analysis of economic impact and coordination with the NIST research and development effort, using review procedures similar to those that guided the development and adoption of the seismic code.
Recommendation J 1. Publish structural design guidelines for optional application to enhance 1
robustness and resistance to progressive collapse. )
4.1.2 Use of Lightweight Structural Members
Of major concern to the Structural Strength Working Group was the ability of fireproofing to adequately perform on lightweight structural members, specifically, open web bar trusses, the type of trusses used in the WTC towers. As the weight (mass) of the bar diminishes, typically so too does the surface area to which the fireproofing is applied. The adherence of spray on fireproofing, that most often used in conjunction with these trusses, has been called into question by initial investigations of the towers. To cover a lightweight element, one that has an already lower resistance to fire due to its size, with fireproofing of dubious performance is unwise at best. I A standard discussed by the group which uses a ratio of weight (mass) to surface area calculation to produce a minimum allowable size factor was not adopted because the group could not determine with the information available to it what would, ultimately constitute a "safe" minimum size.
i Page 18 WTC Building Code Task Force February 2003 Findings and Recommendations
1
NYC-WTC_000166504
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141695
Section of an environmental assessment describing existing physical conditions and construction impacts at the World Trade Center site.
4 shared non-person entities · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
2 shared non-person entities · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141585
Map showing the condition of buildings at the World Trade Center site as of September 21, 2001.
9 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
4 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168718
Document outlining fire evacuation procedures and objectives for 7 World Trade Center.
3 shared non-person entities · 1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173475
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
6 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
7 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0139.
Cited alongside this record in an Ask answer