NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
NYC-WTC_000166488–000166533Folder label: “NYC DOB WTC Building Code Task Force Findings and Recomendations - Feb. 2003”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
2.2.2 Working Groups Working Groups were established to investigate four major areas that affect building performance and occupant safety during emergency events. An additional working group was established to review the enforcement of building requirements by the DOB, the City's primary design and construction regulatory body, and the enactment of recommendations of the Task Force. The five Working Groups were: • Structural strength • Fire protection • Emergency evacuation • Mechanical systems • Department of Buildings operations Only members of the Executive Committee could lead Working Groups and all Executive I Committee members were invited to attend any Working Group meetings. The Working Group leaders invited experts to participate in discussion by submitting reports, attending meetings arid I making presentations. Experts addressing issues that overlapped Working Group areas made ) presentations to a combination of those Working Groups or to the entire Task Force.. Permanent members of Working Groups were sponsored by Executive Committee members. 'i
2.2.3 Public Forum The Department of Buildings held a Public Forum on August 13, 2002 to ensure that the Task Force received input from all groups affected by the events of September 11th and any group potentially affected by possible changes to the Building Code. The general public was invited to submit requests to present testimony. Selection of speakers was based on the proposed presentation relative to the working group areas of focus as well as creating a representative II 1 sample of interested individuals and groups. Those who could not attend were encouraged to send written submissions to the Task Force. Materials not able to be presented at the forum were also accepted and reviewed by the Task Force.
2.3 Methodology Information regarding the specific events of September 11th was largely taken from the FEMA World Trade Center Building Performance Study Report (BPS Report) as the best available single source of information. Other information collected through inspection reports, expert . assessment, or eyewitness testimony did not substantially contradict the findings of this report. As . a result, the specific events and findings of the BPS Report will not be reiterated in this report. Study issues were identified by the Task Force and by the Working Groups through consultation I of written reports, as well as presentations made by agencies, organizations and individuals involved in analyzing the disaster, including public forum testimony. Study issues from these sources were assigned to the Working Groups by area of focus. Issues that involved more than one discipline were considered by all appropriate groups. Oftentimes one group acted as lead examiners with other Working Groups contributing as needed.
I
Page 14 WTC Building Code Task Force February 2003 Findings and Recommendations i NYC-WTC_000166500
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141695
Section of an environmental assessment describing existing physical conditions and construction impacts at the World Trade Center site.
4 shared non-person entities · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
2 shared non-person entities · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141585
Map showing the condition of buildings at the World Trade Center site as of September 21, 2001.
9 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
4 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168718
Document outlining fire evacuation procedures and objectives for 7 World Trade Center.
3 shared non-person entities · 1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
2 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173475
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
6 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
7 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0139.
Cited alongside this record in an Ask answer