NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
8 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗State agency review of Con-Edison's plan detailing the release of transformer oil and cable dielectric fluid at the World Trade Center site.
NYC-WTC_000165927–000165937
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
NOV y lyyj 1^5 .-1^
P.5 bW 21 '01 06:02PM R & D
southwestern boundary delineator. No access is available beyond the southern border of the 7WTC footprint due to the on-going demolition activities to the south of Vesey Street.
The Con Edison uansfbnneTS at the site were situated in aboveground concrete vaults, the walls of which extend below grade. MW-6 and MW-7 will be installed in order to detennine whether there has been any pooling of product within the coacnete vaults. If product is identified, the wells will serve as product recovery points as well as delineate the northern and northeastern boundaries, respectively.
UTILITY CLEARANCE
Jacques Whitford Company, Inc. (JWC), Con Edison’s consultant, has called in and started the Code 53 Utility Mark-Out process. Utilities clearance is expected by Monday, November 19, 2001. Con Edison will verify utility clearance for 7WTC building footprint and surrounding area. Due to unmarked Verizon, utilities at the intersoction of Vesey Street and Washington, Verizon personal will bo available on-site to give utility clearance at the MW-5 location.
MONITORING WELL INSTALLATION & COLLECTION OF SAMPLES
The soil borings for the installation of the monitoring wells will be advanced using a drill rig equipped with hollow stem auger (HSA) and air rotary capabilities. Where feasible, spilt spoon samplers will be advanced at five-foot intervals until the final depth of the boring, which will be at approximately 10 feet below the observed water table. Groundwater is anticipated to be encountered at 15 feet below grade, with the expected total depth of each boring being 25 feet below grade.
A geologist or engineer firom JWC will supervise the drilling activities. Drilling will be conducted by Aquifer Drilling & Testing, under subcontract to JWC. The lithology of the soil and any physical evidence of contamination in the soil samples will be documented. Soil boring and well construction logs will be completed for each attempted location.
At each drilling location, split spoon samples will be collected continuously. Soil samples will be examined for visual and olfactory evidence of contamination and screened for the presence of volatile organic compounds with a Photo Ionization Detector (PID). The soil sample showing the most evidence of contamination will be set aside for possible laboratory analysis. If no evidence of contaminatioc is observed in the soil samples, the sample directly above the water table will be set aside for possible laboratory analysis.
A decontamination pad will be constructed on-site to clean the split spoons prior to the commenccoieat of drilling and after each use. Decontamination will consist of scrubbing with a noc-phojphatc detergent and potable water solution and rinsing with potable water, at a minimum. All decontamination water will be contained until disposal.
C:\13ocum«titi»«! astdngs'priecALocal SttnufiiTcmporary btiemoi ?;ic8'OI.KJE'WorW’lan-Xevi»«dl J dac Page 3of 5
NYC-WTC_000165933
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
8 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152439
Letter from Con Edison to DEP regarding follow-up on water pumped from a gas main during the World Trade Center recovery.
5 shared non-person entities · 1 shared topics · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000148742
Notice instructing staff to preserve original World Trade Center documents for potential legal actions against the City.
6 shared non-person entities · 1 shared topics · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000137900
Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.
7 shared non-person entities · 1 shared topics · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
4 shared non-person entities · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
10 shared non-person entities · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152099
Memo discussing a Commissioner's Order to clean WTC residue from a vacant building near the World Trade Center site.
3 shared non-person entities · 1 shared topics · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000144741
Standard administrative notice requiring the retention of original World Trade Center records as evidence for future legal actions.
3 shared non-person entities · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
1 shared non-person entities · 1 shared topics · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
3 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
Similarity score 0.942 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
Similarity score 0.940 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155525
Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
Similarity score 0.940 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.939 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.939 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
Similarity score 0.939 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000152439
Letter from Con Edison to DEP regarding follow-up on water pumped from a gas main during the World Trade Center recovery.
Cited alongside this record in an Ask answer
NYC-WTC_000104694
Newsletter excerpt featuring an interview with a hospital engineering director regarding challenges during the September 11 attacks.
Cited alongside this record in an Ask answer
Official notice instructing building engineers on procedures to arrange gas service reconnection at World Trade Center sites.
Cited alongside this record in an Ask answer
NYC-WTC_000159250
Correspondence discussing water main replacements due to age and a street cave-in investigation at an unspecified location.
Cited alongside this record in an Ask answer
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
Cited alongside this record in an Ask answer