southwestern boundary delineator. No access is available beyond the southern border
of the 7WTC footprint due to the on-going demolition activities to the south of Vesey
Street.
The Con Edison uansfbnneTS at the site were situated in aboveground concrete vaults, the
walls of which extend below grade. MW-6 and MW-7 will be installed in order to
detennine whether there has been any pooling of product within the coacnete vaults. If
product is identified, the wells will serve as product recovery points as well as delineate
the northern and northeastern boundaries, respectively.
UTILITY CLEARANCE
Jacques Whitford Company, Inc. (JWC), Con Edison’s consultant, has called in and
started the Code 53 Utility Mark-Out process. Utilities clearance is expected by Monday,
November 19, 2001. Con Edison will verify utility clearance for 7WTC building
footprint and surrounding area. Due to unmarked Verizon, utilities at the intersoction of
Vesey Street and Washington, Verizon personal will bo available on-site to give utility
clearance at the MW-5 location.
MONITORING WELL INSTALLATION & COLLECTION OF SAMPLES
The soil borings for the installation of the monitoring wells will be advanced using a drill
rig equipped with hollow stem auger (HSA) and air rotary capabilities. Where feasible,
spilt spoon samplers will be advanced at five-foot intervals until the final depth of the
boring, which will be at approximately 10 feet below the observed water table.
Groundwater is anticipated to be encountered at 15 feet below grade, with the expected
total depth of each boring being 25 feet below grade.
A geologist or engineer firom JWC will supervise the drilling activities. Drilling will be
conducted by Aquifer Drilling & Testing, under subcontract to JWC. The lithology of
the soil and any physical evidence of contamination in the soil samples will be
documented. Soil boring and well construction logs will be completed for each attempted
location.
At each drilling location, split spoon samples will be collected continuously. Soil
samples will be examined for visual and olfactory evidence of contamination and
screened for the presence of volatile organic compounds with a Photo Ionization Detector
(PID). The soil sample showing the most evidence of contamination will be set aside for
possible laboratory analysis. If no evidence of contaminatioc is observed in the soil
samples, the sample directly above the water table will be set aside for possible
laboratory analysis.
A decontamination pad will be constructed on-site to clean the split spoons prior to the
commenccoieat of drilling and after each use. Decontamination will consist of scrubbing
with a noc-phojphatc detergent and potable water solution and rinsing with potable
water, at a minimum. All decontamination water will be contained until disposal.