1 shared topics · Same agency, volume and box · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗Street Improvement No. 7 World Trade Center
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000165755
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
PARSONS. BRINCKERHOFF, QUADE 8 DOUGLAS. INC.
TELEPHONE CONVERSATION MEMORANDUM
Project AMTRAK Job Ma 2162A201 8/6/86 (Use Complete Number)
From G. Wall Talked to Morton Swedlow - BOS
Indicate Department. Field Otfice, etc. tor "In Houee" call*. Indicote ogency or firm for other then "in House* colls.
Item Discussed Meeting to Present Concepts for Sewer Relocation/Rerouting
Information Obtained _________ _ ___________________ —___________ ___ _________ 1. Morton Swedlow was unaware of the project so I gave him a brief description, naming the impacts on the 33rd and 34th Street Sewers. I also reviewed the history to date including our July 9 submission to BOS, July 18 meeting with Mr. Farag, and my 8/6 conversation with Mr. Aggarwal.
2. T requested a meeting date of August 22, at which we would present our work on alternatives and costs. I again stated AMTRAK representatives would be in attendance, and that it may be appropriate if Mr. Farag wasin attendance. He said he would rhAOk Mt~. Fayag'g calpndaT* and get back t~n mp nnnnpyni na thp August 22 meeting date.
Action Required
------ -------------------------------------------------- Irfan Magdi Rai ^torton M. Hand AG GO Oncu Farag [Aggarwal SwUdlow Distribution’ AMTRAK By^ BOS
NYC-WTC_000165755
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000165753
Telephone conversation memorandum from Parsons Brinckerhoff regarding a meeting with DEP Bureau of Sewers on August 1, 1986.
1 shared topics · Same agency, volume and box · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.893
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165384
Internal memorandum acknowledging receipt of 90% submission drawings for the Westside Connection Project and referencing hydraulic computations.
1 shared topics · Same agency, volume and box · similarity 0.892
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.892
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165405
Inter-office memorandum requesting review of hydraulic computations for the siphon and gravity sewer routing in the 60% submission.
1 shared topics · Same agency, volume and box · similarity 0.890
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165403
Inter-office memorandum requesting hydraulic review of the proposed siphon in the Westside Connection Project.
1 shared topics · Same agency, volume and box · similarity 0.890
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165399
Internal memorandum inquiring whether the Bureau accepts the proposed siphon concept shown in the 60% submission drawings for the Westside Connection Project.
1 shared topics · Same agency, volume and box · similarity 0.887
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.884
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.883
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.882
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.881
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000165729
Fragmented text page from a record concerning World Trade Center No. 7, likely related to environmental or construction matters.
Filed in the same folder
NYC-WTC_000165730
Fragmented and illegible text from a DEP archive folder concerning World Trade Center No. 7 infrastructure.
Filed in the same folder
Correspondence requesting revisions to drawing BP-2 for the 7 World Trade Center sewer project plans.
Filed in the same folder
Letter submitting revised pavement plans addressing catch basin placement and storm drainage connections at Vesey Street.
Filed in the same folder
Transmittal of revised pavement plans retaining existing catch basins and adjusting grates to meet proposed grades.
Filed in the same folder