TELEPHONE CONVERSATION MEMORANDUMI
Project AMTRAK Job No.. Date B/6/86
(Use Complete Number)
From G. Wall Talked to Bai Aggarwal NYCDEP BOS
566-5ei5 (9t05 AM)
indicote Department. Field Office, etc. for "In Houee" coll*.
Indicate ogency or firm for other than "in Houee* colls.
_ YlilcEiveb
D.E.P./BUREAU OF SEWERS
AUG 1 1 1986
Item Discussed SEE BELOW
DIVISION OF
■SEWefHtedrtffcATtOIt
AND CONTROL
Information Obtained ----- -------- —.—
____ 1.) P.D, Format: I informed R.A. that in OUT Julv 18 meeting. Mr. Parag had
agreed we would first submit a concept submission containing alternatives.
with sufficient hydraulic data to allow selection of an alt^rnat-ive.
After selection of an alternative, we would ultimately follow the P.D.
format in otir final submission. I also noted this was a project for a
national railroad agency, that no additional flows were being generated as
a result of the project, and therefore, that certain components of the PD
t
format would not be applicabl
after "A". I suggested we could discuss applicability of the standard PD
requirements after an alternative was selected. He agreed.
2.) Alternatives to be Examined; I informed R.A. that we were examining 2
rerouting alternatives — the only 2 we could identify which would not
require pumping or syphons. I also noted that Amtr^ had requested that
we look at syphons.
3.) Original July 9 Submiasion;- I informed R.A.- that our BuTatrissinn had Hopn
based on Preliminary Engineering work done by SSVK, which showed syphons
at 33rd and 34th Streets. We had made the assumption that SSVK would have
checked the concept through with BOS, which they apparently did not do.