machine-extracted · confidence unavailable · Check page ↗Telephone conversation memorandum, Parsons Brinckerhoff, Aug 1986
Machine-extracted title · confidence 95%Telephone conversation memorandum from Parsons Brinckerhoff regarding a meeting with DEP Bureau of Sewers on August 1, 1986.
NYC-WTC_000165753–000165754Folder label: “Street Improvement No. 7 World Trade Center”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
PARSONS. BRINCKERHOFF, QUADE S DOUGLAS. INC.
TELEPHONE CONVERSATION MEMORANDUMI
Project AMTRAK Job No.. Date B/6/86 (Use Complete Number)
From G. Wall Talked to Bai Aggarwal NYCDEP BOS 566-5ei5 (9t05 AM)
indicote Department. Field Office, etc. for "In Houee" coll*. Indicate ogency or firm for other than "in Houee* colls. _ YlilcEiveb D.E.P./BUREAU OF SEWERS
AUG 1 1 1986 Item Discussed SEE BELOW DIVISION OF ■SEWefHtedrtffcATtOIt AND CONTROL
Information Obtained ----- -------- —.— ____ 1.) P.D, Format: I informed R.A. that in OUT Julv 18 meeting. Mr. Parag had agreed we would first submit a concept submission containing alternatives. with sufficient hydraulic data to allow selection of an alt^rnat-ive. After selection of an alternative, we would ultimately follow the P.D. format in otir final submission. I also noted this was a project for a national railroad agency, that no additional flows were being generated as a result of the project, and therefore, that certain components of the PD
t format would not be applicabl after "A". I suggested we could discuss applicability of the standard PD requirements after an alternative was selected. He agreed. 2.) Alternatives to be Examined; I informed R.A. that we were examining 2 rerouting alternatives — the only 2 we could identify which would not require pumping or syphons. I also noted that Amtr^ had requested that we look at syphons.
3.) Original July 9 Submiasion;- I informed R.A.- that our BuTatrissinn had Hopn based on Preliminary Engineering work done by SSVK, which showed syphons at 33rd and 34th Streets. We had made the assumption that SSVK would have checked the concept through with BOS, which they apparently did not do. i;r*p KiearT
Action Required
Distribution' By-
NYC-WTC_000165753
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
1 shared topics · Same agency, volume and box · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.925
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165403
Inter-office memorandum requesting hydraulic review of the proposed siphon in the Westside Connection Project.
1 shared topics · Same agency, volume and box · similarity 0.905
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165405
Inter-office memorandum requesting review of hydraulic computations for the siphon and gravity sewer routing in the 60% submission.
1 shared topics · Same agency, volume and box · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165687
Letter from DEP Office of Legal Counsel enclosing an executed agreement regarding a sewer matter near 11th Avenue and West 33rd Street.
1 shared topics · Same agency, volume and box · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165290
Letter enclosing a signed agreement between DEP and a contractor regarding sewer work in the vicinity of 11th Avenue.
1 shared topics · Same agency, volume and box · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165384
Internal memorandum acknowledging receipt of 90% submission drawings for the Westside Connection Project and referencing hydraulic computations.
1 shared topics · Same agency, volume and box · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000165729
Fragmented text page from a record concerning World Trade Center No. 7, likely related to environmental or construction matters.
Filed in the same folder
NYC-WTC_000165730
Fragmented and illegible text from a DEP archive folder concerning World Trade Center No. 7 infrastructure.
Filed in the same folder
Correspondence requesting revisions to drawing BP-2 for the 7 World Trade Center sewer project plans.
Filed in the same folder
Letter submitting revised pavement plans addressing catch basin placement and storm drainage connections at Vesey Street.
Filed in the same folder
Transmittal of revised pavement plans retaining existing catch basins and adjusting grates to meet proposed grades.
Filed in the same folder