Telephone conversation memorandum, Parsons Brinckerhoff, Aug 1986

Machine-extracted title · confidence 95%

Telephone conversation memorandum from Parsons Brinckerhoff regarding a meeting with DEP Bureau of Sewers on August 1, 1986.

NYC-WTC_000165753–000165754

Folder label: “Street Improvement No. 7 World Trade Center

Page image
Scanned page image, NYC-WTC_000165753
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PARSONS. BRINCKERHOFF, QUADE S DOUGLAS. INC.

TELEPHONE CONVERSATION MEMORANDUMI

Project AMTRAK Job No.. Date B/6/86 (Use Complete Number)

From G. Wall Talked to Bai Aggarwal NYCDEP BOS 566-5ei5 (9t05 AM)

indicote Department. Field Office, etc. for "In Houee" coll*. Indicate ogency or firm for other than "in Houee* colls. _ YlilcEiveb D.E.P./BUREAU OF SEWERS

AUG 1 1 1986 Item Discussed SEE BELOW DIVISION OF ■SEWefHtedrtffcATtOIt AND CONTROL

Information Obtained ----- -------- —.— ____ 1.) P.D, Format: I informed R.A. that in OUT Julv 18 meeting. Mr. Parag had agreed we would first submit a concept submission containing alternatives. with sufficient hydraulic data to allow selection of an alt^rnat-ive. After selection of an alternative, we would ultimately follow the P.D. format in otir final submission. I also noted this was a project for a national railroad agency, that no additional flows were being generated as a result of the project, and therefore, that certain components of the PD

t format would not be applicabl after "A". I suggested we could discuss applicability of the standard PD requirements after an alternative was selected. He agreed. 2.) Alternatives to be Examined; I informed R.A. that we were examining 2 rerouting alternatives — the only 2 we could identify which would not require pumping or syphons. I also noted that Amtr^ had requested that we look at syphons.

3.) Original July 9 Submiasion;- I informed R.A.- that our BuTatrissinn had Hopn based on Preliminary Engineering work done by SSVK, which showed syphons at 33rd and 34th Streets. We had made the assumption that SSVK would have checked the concept through with BOS, which they apparently did not do. i;r*p KiearT

Action Required

Distribution' By-

NYC-WTC_000165753

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165753Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165734 · Box DEP Box 44

Letter submitting revised pavement plans addressing catch basin placement and storm drainage connections at Vesey Street.

Filed in the same folder

Compare copies and versions →