DEP memo re: WTC Dey St escalator underpass report

Machine-extracted title · confidence 95%

June 5, 1984 internal DEP memorandum forwarding a sewer maintenance report by E.A. Britton regarding the WTC Dey Street project.

NYC-WTC_000165506–000165518

Folder label: “P.A WTC C-81, DEY St. Replacement Sewer (WTC-DEY ST UNDERPASS)

Page image
Scanned page image, NYC-WTC_000165507
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Dbii 331.000

June 5, 1984

REPORT FOR THE RECORD

RE: W.T.C. 776 Dey Street Escalator Underpass at Church Street, Borough of Manhattan

Responding to a request from the Engineering Review Section (D.S.M) an inspection of the sewer at the above captioned location was conducted by personnel from this Division. (Prompt assistance for a stream shut­ down was also offered by Consolidated Edison - William Headey, telephone 576-3758). The following observations were made: Botn 4" vit. spurs (see photos #1,#2,& sketch #1) were observed at m.h. #2 as shown on sketch #1. They were both located 26" apart on the south face of this sewer manhole. 'Spur' 'X' showed definite indication of having a flow (miniscule amount of debris in pipe at this visit — 2:00am), and is therefore connected and alive. The source of flow in this 4" connection could not be readily ascertained, however it is speculated that the connection was made at a non-public service utility of tne E.N.Y. Savings Bank which is located on the south west corner of this intersection. The other spur remains as shown in picture #2 is • unconnected. Structurally, both m.h. #2 & #3 are in extremely poor condition (photos #3 & #8). They are both deluged with 3/4"averagevertical and hor­ izontal cracks. The section of sewer between m.h. #2 & #3 was inspected internally in its entirety. It was generally in good structural & flow conditions. Upstream and extending to about 40' downstream is 3' 6" x 2' 4" elliptical R.C.P. At approximately midway from the sewer invert on the westerly side of this sewer section, there is a 1/4" longitudinal crack (see photo #4) which extends from m.h. #2 to about 20' downstream. This condition does not appear to impact greatly on the overall structural integrity of the sewer. . Adjoining the approximated limit of the concrete section, is a 3’ 6" X 2' 4" elliptical cast iron sewer (see photos #5, #6, #7) which extends to about 25' downstream. At its point of termination, the identical size sewer is constructed of brick (see photo #6, & #7). At tne time of this visit, there was approximately 4” of unobstructed sewage flow. There was also a zero silt deposition.

NYC-WTC_000165507

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165507Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →