Samples, readings and decisions over time
Candidates extracted by machine can misread scans. Dates, substances, values and labs below occur on the same page; their relationship is not established — a value shown is a number found on the page, not a confirmed reading. Verify the page.
No test candidates in this selection.
Documents for this building
2 documents across 1 box, grouped by what each document is. Titles and summaries are machine-written; the page image is the authority.
Memo or letter · 2
June 29, 1984 letter from Port Authority transmitting final drawings and specifications for the WTC Dey Street escalator underpass to DEP.
4 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “P.A WTC C-81, DEY St. Replacement Sewer (WTC-DEY ST UNDERPASS)” · matched page 4June 5, 1984 internal DEP memorandum forwarding a sewer maintenance report by E.A. Britton regarding the WTC Dey Street project.
13 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “P.A WTC C-81, DEY St. Replacement Sewer (WTC-DEY ST UNDERPASS)” · matched page 2Related buildings on the same block
Block-lot keys and present-day footprint joins; not a reconstruction of 2001 buildings.
No same-block matches established by this place’s block-lot key or present-day footprint join.