1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗Tunnel W. 33rd-38th Street plan approval, Feb 1988
Machine-extracted title · confidence 90%DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
NYC-WTC_000165301–000165303Folder label: “North Access Tunnel W. 33rd St. To w. 38TH ST”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
A'
Comment No. 7 (by Mr. D. Smith) The added manhole opening in the Flow Redirection Chamber near Chamber No. 3 has been relocated to be aligned with the steps. See Drawing No. S-35. Comment No. 8 (by Mr.D. Smith) The longitudinal bars of the 48" diameter pipe encasement are #6 @ 12" and the bottom bars are extended to tie the pipe encasement with the flow redirection chamber. See Drawing No. S-35. We trust this submittal resolves all your comments on the siphon design for the North Access Connection Tunnel. As you are aware this project has enormous benefits to the transportation system in New York City. It will increase riderships, improve public services, reduce public cost, reduce auto usage and provide significant environmental improvement. Therefore, an expeditious approval will serve well the City of New York and AMTRAK. Very truly yours. PARSONS BRINCKERHOFF QUADE & DOUGLAS, INC.
1
alcin M. Tarhan' Acting Project Manager
NAM/mjr(VI11:42) Encl. cc: Mr. A. Shaw - Amtrak
zi Cf'niurv nf
NYC-WTC_000165303
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000165384
Internal memorandum acknowledging receipt of 90% submission drawings for the Westside Connection Project and referencing hydraulic computations.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165401
Inter-office memorandum inquiring if the proposed siphon concept in the 60% submission drawings is acceptable to the Bureau of Sewers.
1 shared topics · Same agency, volume and box · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165399
Internal memorandum inquiring whether the Bureau accepts the proposed siphon concept shown in the 60% submission drawings for the Westside Connection Project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165365
DEP Bureau of Sewers clarifies hydraulic review procedures and provides technical comments on proposed siphon design in tunnel.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165684
Follow-up memo requesting resubmission of missing design calculations for project manholes.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165403
Inter-office memorandum requesting hydraulic review of the proposed siphon in the Westside Connection Project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165405
Inter-office memorandum requesting review of hydraulic computations for the siphon and gravity sewer routing in the 60% submission.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165322
Department of Environmental Protection letter providing design review comments on tunnel project contract drawings, requesting pressure relief manhole details, existing sewer…
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000165289
Environmental Protection Department record related to tunnel project between W. 33rd and W. 38th Street.
Filed in the same folder
NYC-WTC_000165290
Letter enclosing a signed agreement between DEP and a contractor regarding sewer work in the vicinity of 11th Avenue.
Filed in the same folder
NYC-WTC_000165299
DEP legal correspondence regarding tunnel construction and sewer work in vicinity of 11th Avenue and W. 33rd Street.
Filed in the same folder
Filed in the same folder
NYC-WTC_000165306
Engineering drawings and technical documents related to tunnel project between W. 33rd and W. 38th Street.
Filed in the same folder