other telephone number as may be designated by Amtrak in writ
t
ing) , and shall thereafter, upon request of Amtrak, submit plans
or other documents describing the work performed.
e. Amtrak shall provide vehicular access for DEP
to the vicinity of the New Sewer by way of a non-public mainte-
nance road or otherwise. Amtrak may, at its option, provide DEP
with a key to the gate leading to such maintenance road, keep
such a key at Pennsylvania Station or other twenty-four (24)
hour a day facility where it can be made readily available to
DEP, or make other provision(s) that will assure access to DEP
twenty-four (24) hours a day, seven (7) days a week. Notwith-
standing the foregoing, Amtrak shall remain obligated to make
access to the New Sewer available at all times to DEP.
f. With the exception of routine maintenance.
inspection and repair of the Tunnel, and of the track and other
material and equipment located therein, Amtrak shall perform no
construction work within a forty-six (46) foot wide corridor
centered about the New Sewer without the prior written approval
of DEP, which approval shall not be unreasonably withheld or
delayed.
5. Applicable Law. Pursuant to the terms of 45
U.S.C. § 546(d), this Agreement shall be govezned by the laws of
the District of Columbia.
6. Amendment. This Agreement may be amended only by
an instrument in writing signed by both parties.
- 5 -
NYC-WTC_000165295
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000165295Source: NYC Law Department, mirrored locally
Internal memorandum inquiring whether the Bureau accepts the proposed siphon concept shown in the 60% submission drawings for the Westside Connection Project.
2 shared non-person entities · Same agency, volume and box · similarity 0.945