← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165193
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I Battery Park City I Commercial Center Bldg. ’B’ WTC River Water Intake System Relocations

I

used with this method. 3. Aggregates shall be weighed on scales having a ■degree of control of accuracy such•that thel de­ livered weights are correct within two. percent. Moisture, both free and absorbed, shall be correc­ ted for and the free moisture shall be taken into account when dispensing the mixing water. 4. Water shall be measured by volume or weight with an accuracy and control within a one percent tol­ erance. 5. When the outdoor temperature is below 4Q®F or is likely to fall below 40®F during the 24-hour peri­ od after placing, adequate equipment shall be provide for heating the concrete material and pro­ tecting the concrete against freezing. but no frozen materials or materials containing ice shall be used. Temperatures of the separate materials, including the mixing water, when placed in' the mixer, shall not exceed■ ■140®F. When placed in forms, the concrete shall have a temperature be- tween 50®P and 70®F. B. MIXING CONCRETE 1. _____ otherwise authorized.. the mixing of ,con­ Unless crete shall be done in a batch mixer of approved type or in transit-mix equipment conforming to ASTM Specification C-94-78, using Alternate No. 2 method to determine quality. The volume of the mixed material for each batch shall not exceed the manufacturer's rated capacity of the mixer. 12 transit-mixed, the materials shall be brought to the site dry and the period of time from batching to the addition of water at the site of the pour shall not exceed thirty minutes. 2« Site mixed concrete shall be mixed in an approved batch mixer and the batching and mixing shall be of sufficient capacity and power to carry out each prearranged concrete operation without danger of delay or interruption until the unit or con'crete pour is completed. The mixer drum shall be ro­ tated at the speed recommended by the manufacturer and mixing of the concrete ingredients'shall con­ tinue for not less than 1-1/2 minutes from the time , all of the materials, including the water, are in the mixer drum. Mixing shall continue

Concrete For Mechanical Work •I insn-4 NYC-WTC_000165193

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165193Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →