NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165190
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery Park City Commercial Center Bldg. 'E’ WTC River Water Intake System Relocations

SECTION 15050 CONCRETE FOR MECHANICAL WORK

PARTItGENER^

A. DESCRIPTION 1. The work covered by this division of tiie specifi- cations includes the construction described including all labor necessary to perform and complete such construction. all materials and equipment incorporated or to be incorporated in such construction and all services, facilities, tools and equipment necessary or used to perform and complete such construction. 2. Work included; The work of this section shall include, but is not limited to, the following: a. Reinforced concrete for piping systems. b. Concrete pipe supports, support cradles, and pipe thrust blocks. * c. Reiniforced concrete for pipe access man­ holes. d. For alternate M-1: Concrete for steel pipe encasement. e. Miscellaneous concrete members. 3. Related work included in this division but speci­ fied elsewhere: a. Reinforced concrete piping. Section 15020 .b. Alternate M-1: Steel pipe, concrete encased. Section 15020 B. SUBMITTALS 1. Shop drawings: Submit shop and piacemerrt drawings of; Reinforcing steel, pipe support details, pipe cradle details, pipe thrust block details, Pipe access manhole details. 2, Submit design mix for 4,000 psi concrete.

Concrete For Mechanical Work 15050-1 NYC-WTC_000165190

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165190Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →