SECTION 15020
PRESTRESSED CONCRETE
CYLINDER PIPE
PART I ~ GENERAL
Ac DESCRIPTION
1 The work covered by this division of the specifications
includes the construction described including all labor
necessary to perform and complete such construction, all
materials and equipment incorporated or to be incorpor
ated in such construction and all services, facilities,
tools and equipment necessary or used to perform and
complete such construction.
2. Work included: The work of the section includes but is
not limited to the following:
a. 2O’’0 prestressed concrete cylinder pipe (PCCP)
including joints, and fittings.
b. Pipe manufacturer’s installation supervision.
3. Related work included in this division but specified
elsewhere:
a. Pipe testing, examinations and inspections. Sec
tion 15040
B. SUBMITTALS
1. Shop drawings: Submit shop drawings of pipe layout
Including: dimensioned plans, profiles and sections,
pipe details including: joints, fittings, elbov/s, trans
itions, pipe lengths and connections to existing piping.
2. Product data: Submit manufacturer’s latest published
data for materials and equipment.
Prestressed Concrete
Cylinder Pipe
15030-1