NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165179
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery Park City Commercial Center Bldg. ’B’ WTC River Water Intake System Relocations

The entire surface shall b> carefully tested for pinholes using a.-67-l/2 volt Tinker-Razor holiday detector instru­ ment and any pinholes shall be marked and touched up as required. (c) After field welding and radiography are complete, all welded joints and coated areas damaged during construction shall be cleaned to bright metal by means of a coarse, power driven sanding disc and both interior and exterior surfaces shall be coated as specified above, "feathered-into" the existing coating for three to four inches. When the pi­ ping is completely coated, and just prior to encasement the entire surface shall be carefully tested for pinholes using a 67-1/2 volt Tinker-Razor holi­ day detector instrument as described hereinbefore. C. Access Manholes, Clean-Out Manholes 1. Access manholes of reinforced concrete structure shall be constructed for the 66" I.D. and 20" I.D. river water intake lines. Manholes shall be provided with heavy-duty roadway cast iron frame and cover. 2. Access manholes having a depth of 2’-0" or great­ er shall be provided with steel ladder rungs anchored into the concrete. Refer to contract dravrings for dimensions and construction details. D. Alternates The Subcontractor shall state the amount to be added and/or deducted from the base bid to provide the fol­ lowing ALTERNATES.

Reinforced Concrete Pipe 15020-6

NYC-WTC_000165179

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165179Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →