Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165178
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery Park City Commercial Center Bldg. ’B’ WTC River Water Intake System Relocations

1. Welding rings shall be used at all butt welded joints. Rings shall be -Robvon Type CC, Imperial Std. 136-S or approved equal. 4. Coating of 66" ID River Water Piping: The in­ terior and exterior surfaces of the 66" I.D. steel pipe and fittings including access man­ holes, leak plates and other attachments shall be shop coated by an approved coating company such as "Energy Coatings Company of North Arlington, New Jersey" or as approved by the engineer. (a) Interior Coating: The interior sur­ faces shall be prepared by sandblasting to a,near white condition as per Steel Structures Fainting Council SSPC-SPIO- 63. All sand shall be removed from the pipe and the surface thoroughly brushed down to remove dust. Provide coal tar epoxy coating "TARSET C-200" manufac­ tured by Porter Paint Company. The coating shall be applied in two coats and the total dry fill thickness shall be a minimum of 16 mils. The finished coating shall be tested for pinholes using a .67-1/2 volt Tinker-Razor holi­ day detector instrument. Any pinholed areas shall be marked and touched up following the same procedure as above. (b) Exterior Coating: Surfaces shall be prepared by sandblasting to a near white condition as per Steel Structures Painting Council SSPC-SSPC-SPlO-63. Provide one coat of Coal-Tar Enamel, Fibrous-Glass Mat, and Bonded Asbestos- Felt Wrap shall be brush, roller or spray applied to a thickness of approx­ imately 6 mils and allowed to harden. Materials, method of application, tests and handling shall conform to the AWWA Standard C-203, Section A 1.5, 1973 edition.

Reinforced Concrete Pipe 15020-5

NYC-WTC_000165178

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165178Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →