NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165117
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

shall be unclassified excavation and shall be removed, transported and disposed of as specified in this Section. B. MATERIAL CLASSIFICATION 1. For purposes of disposal only, excavated material shall be classified as follows: a. Recent fill - Recent fill is primarily a fine relatively uniform sized sand hydraulically placed for the construction of the Battery Park City landfill. Slight mixing or interbedding of the sand and the underlying organics at their interface, provided that the silt is not more than 10 percent of the volume will be classified as recent fill with the approval of the Contractor b. Organic silt - Organic silt is primarily river deposits of organic clayey silt left in place during the construction of the Battery Park City landfill. c. Miscellaneous unsuitable - Miscellaneous unsuitable shall be wood”^ timber^ or steel exceeding one cubic foot in volume, ^d;pieces, of rock or concrete exceeding two feet in maxiinjm dimension or four feet in area.

III. A. EXCAVATION - SOIL .1. All material within the boundaries of the work shall be removed to the excavation subgrades indicated on the Drawings. 2. Backfill, grade and compact all areas and volumes excavated beyond the limits showm on the drawings with recent fill. B. TEMPORARY SHEETING 1. The sides of pits and changes in subgrade levels shall be supported by suitable sheet piling or sheeting held in place by soldier beams, braces, shores or wales. Timber am steel used for the sheeting system may be either nev; or used, but must, in all cases, be sound, free fr’cm defects and suitable for its intended use.

02200-2 W3RLD TRADE CENTER BEDOCfiTIONS

BPC-COMMERCIAL CENTER 02200-2

NYC-WTC_000165117

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165117Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →