NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165161
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery^lkrk City Commercial Center Bldg. ’B’ WTC River Water Intake System Relocations

SECTION 15010 MECHANICAL SPECIAL CONDITIONS

PART I - GENERAL

1.01 DESCRIPTION A. General I. The General Conditions for Contracts of Construc­ tion, referred to in the Contract Documents as the General Conditions, together with the follow­ ing articles of the Mechanical Special Condi­ tions, which amend, modify and supplement various articles and provisions of the General Conditions are made part of the Contract and shall apply to all work under the Contract. 2. All articles or parts of articles of the General Conditions not so amended, modified or supple­ mented by these Supplementary Conditions, shall remain in full force and effect. Should any dis­ crepancy become apparent between the General Con­ ditions and these Special Conditions, the Subcon­ tractor shall notify the Contractor, in writing, and the Contractor shall interpret and decide such matters in accordance with the provisions of the General Conditions. B. Work Included Ths work covered by this subcontract includes the construction described in the Contract Documents including all labor necessary to perform and complete such construction, all materials and euqipment incor­ porated or to be incorporated in such construction. and all services. facilities, tools and equipment necessary or used to , perform and complete such construction. The work includes, but is not limited to, the following: 1. Enlargement of existing 6O”0 reinforced concrete WTC river water pumped discharged pipe line to 66"^ and construction of new 66"g5 line around Building ‘B’ Gatehouse.

Mechanical Special Conditions 15010-1

NYC-WTC_000165161

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165161Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →