← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165145
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

1. Backfill, except for- space between relieving platforms, siiall be recent fill or similar clean sand coirpacted to 95% or ultimate standard Proctor density. 2. Backfill for space betvxien relieving platforms shall be uncompacted lightweight fill ccsiposed of cinders (at least 3 years old and well-leached out) or expanded shale with a maximum particle size of 3 inches.

3. Maximum corpacted lift thiclcness shall not exceed 1'0" in structural areas, such as footings, roads, sidewalks. Maximum ccrpacted lift thickness shall not exceed 24 inches in non-structural areas. E. ’DTSPOSRL

The Subcontractor shall dispose of excavated material in accordance with MRJD Dravzing No. Sp-1, dated 1/15/82. With respect to offsite disposal of naterial, Subcontractor shall cctrply with requirements of General Conditions, Paragraph 2.16.07. ?^cent Fill (F-2) - Recent fill as defined in Paragraph II.B.l.a of this Section~siiall be stockpiled on the Battery Park City site in areas designated by the Contractor. 2. Miscellzmecus Unsuitable (F-1) - Miscellaneous unsuitable as defined in Paragraph II.B.l.b of this Section shall be disposed of off-site at locations selected by the Sijbcontractor. All costs of transporting, permits and disposal sites shall be borne by the Subcontractor.

3. Alternate - The Contractor shall have the operation of having Subcontractor dispose of portions of these materials .which cannot be proprely di.sposed of on the Batter}^ Park City site, as fill conveyed to New York Department of Sanitation. Contact Mr. Walter C. Zwartacky at (212) 566-8870. In such event Subcontractor shall be responsible for all. costs attendant to such disposal and contract price shall reflect any credits realized by Subcontractor, See Bid Form Alternate C.l.

BPCHTM^ERCIAL CENTER ' 02200-3 EARn-BJORK

NYC-WTC_000165145

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165145Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →