SECTION 02110
ALTERATION
I. GENERAL
A. DESCRIPTION
1. The Work covered in tlris division of the Specifications
includes the construction described in this Paragraph A, including cill
labor necessary to per.Lon'!. and ccrplcre such construction, all materials
and equipment incorporated or to be incorporated ir; such construction
and all services, facilities, tools ax id equipment necessary or used to
perform and ccrplete such construction.
a. Remcvc top 2 feet of 2 ’’pedestrian” piers as shown on
Dwg. No. CD.S-1.
B. RELATED TORK NOT HOWED PN TOIS SECT;/CN, BOT SPECIFim
ELSEWHERE
1. The foJ.lowing related items are specified in other
Sections of the Specifications:
a. Earthwork - Section 02200
b. Steel Piling ~ Section 02310
c. Foundation Concrete - Section 03315
C. ^ITOALREgHfiEMEITrS
1. The Subcontractor shall carry out his operations in a
manner that will protect and cause a minimum of interference to adjacent
work which will be underway ext the tin*.:: tliis work is to be performed.
II. PRODUCTS
A.' MATERIALS
1. All alterations debris, rebar and concrete pieces, shall
become the property of the Subcontractor and be remove'! and disposed of
by him at his expense off trsc site.
III. EXECUTION
. A. WORKiViANSHIP