Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165133
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

3. Concrete shall be placed throucjh funnel hopper and inserted into pipe pile and permitted to drop through funnel. The first material placed shall be one cubic foot of 1:2 cement-sand mortar follOT^rd by specified concrete. K. ANALYSES AND CORRECTIVE MEASURES T The analysis and redesign work called for herein shall be performed for the Contractor by the Founda­ tion Engineer. Cost for this work shall be at the Subcontractor's expense. 2. The Foundation Engineer shall analyze the piles.. as driven, to determine whether corrective measures are required. If corrective measures are not required, approval will be given for preceeding with the concrete vzork and there will be no cost for corrective work to the Subcontractor. 3. The Foundation Engineer shall determine the correc­ tive measures required to keep pile loads within allowable limits for those piles driven more than 3 inches from plan location, more than 2% out of plumb, or rejected for whatever reason. Al.l costs shall be at the Subcontractor's expense. 4. If corrective measures involve the ^(bahdohment of piles ,the installation of additional piles, the modi­ fication of pile caps and slabs, the supplemental drawings will be prepared by the Foundation Engineer at the Subcontractor's expense and t.he cost of performing the corrective work shall be at the Sub­ contractor's expense, including furnishing and driving piles, furnishing and placing concrete and all other related materials and work.

BPC-COMMERCIAL CENTER 02363-7 CONCRETE FILLED STEEL PIPE PILES - V\©RLD trade CENTER RELOCATICiN

NYC-WTC_000165133

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165133Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →