NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165132
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

■ F. OBSTRUCTIONS

1. When a pile meets an obstruction which will damage the pile tip or cause the pile to drift off location, the obstruction shall be removed by spudding, augering, or drilling, and the pipe redriven. 2. If in the opinion of the Foundation Engineer, a pile has been damaged by obstructions during driving, or otherwise does not meet Specification requirements, it will be abandoned and a replace­ ment pile driven at the Subcontractor’s expense. 1 G. TOLERANCES 1 1. Piles shall be accurately located and their locations at cut-off elevation shall not vary more than 3 inches from the plan locations siiown on the Contract Drawings. 2. No pile required to be driven piuiRb shall be out of plumb more than 2%. Piles required to be driven on a batter shall not vary from the indi­ cated batter by more than 2%.

n. CUT-OFF 1. The tops of all piles shall be cut off at ele­ vations indicated on the Drawings or as specified by the Contractor. The cut shall be clean and to a true plane.

I; ABANDONED PILES 1.- Abandoned piles shall be pulled or shall be cut off two feet below specified elevation and filled solidly with sand.

J. CONCRETING 1. No concrete shall be placed in any pile until it has been inspected and found free of water, debris or other foreign materials, and the pile shell has been confirmed to be undamaged by Foundation Engineer. 2, All piles for each pile cluster shall be driven prior to placement of concrete within, any pile in a cluster. BPC-COMMERCIAL CENTER 02363-6 CONCRETE FILLED STEEL PIPE PILES - WORLD TRADE CENTER LOCATION

NYC-WTC_000165132

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165132Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →