NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES
Document / 132 pages

Foundation Specifications for WTC River Intake Relocation

Machine-extracted title · confidence 95%

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

NYC-WTC_000165112–000165243

Folder label: “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STATION ELECT. POWER & COMM. LINES

Page image
Scanned page image, NYC-WTC_000165215
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Battery Park City Commercial Center Bldg. "B" WTC Ri-ver Water Intake System Relocations C. Electrical Manholes 1. Concrete for electrical manholes shall conform to the requirements of Class "D” concrete as speci­ fied in Section 16030 of the Specifications. 2. Electrical manholes shall be constructed as shown on the Contract Drawings and in accordance with the Port Authority Standard Drawings 015.010 and 425.101. 3. Frames and covers for manholes shall be similar and equal to Flockhart Foundry Co. Code 60454 with raised cast letters and nameplate on cover. 4. In each manhole installed under this Contract, the Sub-contractor shall furnish and install Man­ hole Cable Racking Assemblies. 5. A manhole cable rack assembly shall consist of one rack Catalog No. DO8B3, for rack hooks, Cata­ log No. DU1S6; and eight insulators, Catalog No. DE5U1 all manufactured by Line Materials Indus­ tries. 6. Approved racking assemblies as manufactured by Oliver Iron and Steel Corp. the Locke Insulator Corp. or Hubbard may be used in lieu of those specified, but the hole spacing for mounting of racks shall be same as those specified. 7. Inserts for electrical manholes shall be similar and equal to Series P-3000 "Onistrut" hot-dipped galvanized concrete inserts in lengths as indi­ cated on the Contract Drawings, complete with end caps, 1/2 inch spring nuts, 1/2 inch steel bolts, and waxed cardboard closer strips. All metallic components for manholes inserts shall be hot- dipped galvanized. P. Wire and Cable 1. The Contract Drawings show the location, type. number and size of wires and cables to be used for this Contract. Complete Specifications for each of the types of wires and cables are con- tained herein.

Electrical Work 16020-4

NYC-WTC_000165215

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165215Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165064 · Box DEP Box 44

Request documentation regarding the relocation of river water intake lines and pump station utilities at the World Trade Center.

Filed in the same folder

Compare copies and versions →