NYC 9/11 Public Portal Document
BATTERY PARK CITY
COMMERCIAL CENTER
WORLD TRADE CENTER RIVER WATER INTAKE SYSTEM
RELOCATIONS
STEEL FILING
SECTION 02310
I. GENERAL
A. DESCRIPTION
The Work covered by this division of the Specifications includes
the construction described in this Paragraph A, including all
labor necessary to perform and complete such construction, all
•materials, and equipme.nt incorporated or to be incorporated in
•such construction and all services, facilities, tools and
equipment necessary or used to perform and complete such
construction.
1. Furnish, install and load test as required , 130 ton
capacity HP 14 x 73 steel piles for support of concrete
deck relieving platform within existing cellular .cofferdam.
2. Furnish all surveys, layouts, ’ and record keeping
incident to pile driving and as specified in the Contract
Documents.
RBLATED WORK NOT INCLUDED IN THIS SECTION
•BUT SPECIFIED ELSEWHERE
i. The following related items are specified in other Sections
of the Specifications.
a- Earthwork - Section 02200
b. Fov.ndation Concrete - Section 0331S
C; Concrete Filled Pipe Piles - Section 02363
C. REFERENCES
1
Perforin all Work in accordance with the latest editions
and’revisions of applicable standards and/or specifications
of;
a. American Institute of Steel Construction (AISC)
b. American Society for Testing & Materials (ASTM)
BPC-COMMERCIAL CENTER STEEL PILING
02310-1
WORLD TPADE CENTER KETOCATICNS
NYC-WTC_000165121
OCR can misread numbers and units. Confirm readings against the page image before using them.