NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 43/E-mails 2002 M. Gilsenan
Document / 11 pages

WTC contractor health and safety meeting handouts, January 2002

Machine-extracted title · confidence 80%

Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.

NYC-WTC_000164098–000164108

Folder label: “E-mails 2002 M. Gilsenan

Page image
Scanned page image, NYC-WTC_000164101
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

7. Recent noise e.vposure sampling results indicate overexposure potential for jack hammering, core drilling, concrete saw cutting, and working in near heavy equipment operations. Workers are encouraged to wear hearing protection such as earplugs. In some instances, such as jack hammering, double protection (i.e., ear plugs and muffs) should be worn.

8. During the regularly scheduled maintenance of heavy industrial equipment, flatbeds, backhoes and dump trucks, it must be insured that the back-up alarms and rear view mirrors are in good working order. This is critical that operators have all the necessary safety equipment in place and working properly in order to assist them in identifying and avoiding pedestrian stnick- by hazards.

9. Personnel access to the pit is tight and the construction site is continuing to shrink. Bruce Rottner reported that a method of ensuring pedestrian routes is becoming critically important. Everyone, including the operators when out of their equipment, should be wearing reflective vests, as well as other required PPE.

10. Bruce Rottner reemphasized that Gators, unless hauling equipment, are not allowed in the pit area. The discussion continued regarding the use of Gators off site. OEM recommended that Gators not be allowed to leave site. Jeff Tasca, BLL/AMEC reported that Gators were used to access Piers 6 and 25. Bruce Rottner of DDC stated that the convenience and privilege of driving Gators may be lost if not used appropriately.

11. In reference to mercury levels. Brace Rottner expressed the need for qualified data and the presentation of such data. The EPA has ongoing sampling operations. Only two samples at grade level resulted in .1 and .4 PPM. OSHA has sampled for mercury and found only 1 result of .9 PPM west of Building 6. OSHA is awaiting the results from 87 samples and will report ASAP. Mike Smith, Shop Steward with Tully reported that ironworkers were doing an independent study. DDC continues to stress avoiding panic over rumors, which may not be the result of significant and qualified data. A request was made for a sampling at 90 Church.

12. Ray Master, BLL/AMEC reported that the parking on West Street would be lost in the very near future. West Street is being cleared for it’s upcoming opening to vehicular traffic.

13. All contractors and other affected parties should be ready to address inclement weather and the impact of those conditions on safe project operations. DOS has been salting areas outside the site and may be including West Street. Liberty Mutual requested that DOS focus on all areas, including areas used by the Salvation Army. Bruce Rottner stressed that we all need to

NYC-WTC_000164101

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000164101Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →