Gilsenan, Michael
From: LaGrotta, Robert [NYCDEP/QUEENS/ROBERTL]
Sent: Tuesday, January 15, 2002 4:28 PM
To: Bennett, Paul; Gilsenan, Michael
Cc: Chapin, Diana; Greeley, Douglas; Lopez, Alfonso
Subject: RE: WTC Contractor Health and Safety Mtg summary 1/15/02
Yes, we were aware of it.
—Original Message—
From: Bennett, Paul
Sent: Tuesday, January 15, 2002 3:30 PM
To: Gilsenan, Michael; LaGrotta, Robert
Cc: Chapin, Diana 001; Greeley, Douglas; Lopez, Alfonso
Subject: WTC Contractor Health and Safety Mtg summary 1/15/02
Date: 01/15/02, 8:00 AM
Location: 3 World Financial Center, 2eth Floor, Training Rm 5.
This meeting was chaired by Bovis, one of the prime contractors.
Topics discussed that may be of interest included:
- Report of a very large amount of what appears to be industrial grease located in the north-east comer
of the pit. - EPA and DEC to investigate.
- Site evacuation alarm to be tested at noon on Friday, Jan 18.
- The Ground Zero Emergency Notification Number - 212-747-9193 is currently out of service. Until
corrected, all WTC related emergencies should be reported to FDNY Manhattan Dispatch at 212-
570-4261.
- Eight RAMS (Real-time Air Monitoring Stations) to be installed by ATC Environmental around the
perimeter of the inner zone.
- Plans are being made to shrink the zone within the next couple of weeks. Plans are to remove the
fence at the outer perimeter, leaving the inner perimeter as the zone.
- OSHA Analysis of bulk samples indicated a maximum level of 0.9 ppm of mercury. This sample was
collected in the vicinity of 6 WTC. This level was reported to be within normal background levels for
NYC. The maximum level of mercury detected at the Staten Island Landfill site was 0.1 ppm. Air
monitoring results were non-detect for mercury. OSHA indicated that copies of their results are
available in their office. I have asked if the info they have in their office is any different than the
information posted on the internet. When I get this info. I'll pass it along.
- Lake Zero, the ponding of water in the lowest part of the excavation, was dewatered sometime
during the past week. I understand that Mike Burton, Deputy Commissioner DDC, spoke to someone at
DEP an advised that the presence of the water was interfering with the rescue efforts and that it needed
to be removed. DDC was given the go ahead. Bob L. - Are you aware of this?
End of meeting
Next meeting scheduled for Tuesday, Jan. 22, at 8:00 AM 3 World Financial Center, 26th Floor, Training
Rm 5.