WTC health and safety meeting summary, January 2002

Machine-extracted title · confidence 90%

Summary of January 8, 2002 WTC site health and safety meeting covering site access requirements, safety training, and equipment protocols.

NYC-WTC_000164094–000164095

Folder label: “E-mails 2002 M. Gilsenan

Page image
Scanned page image, NYC-WTC_000164095
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Page 1 of 1

Gilsenan, Michael From: Bennett, Paul [DEPNET1/DEPGPO2/PaulB] Sent: Tuesday, January 15, 2002 3:30 PM To: Gilsenan, Michael; LaGrotta, Robert Cc: Chapin, Diana 001; Greeley, Douglas; Lopez, Alfonso Subject: WTC Contractor Health and Safety Mtg summary 1/15/02

Date: 01/15/02, 8:00 AM Location: 3 World Financial Center, 26th Floor, Training Rm 5.

This meeting was chaired by Bovis, one of the prime contractors.

Topics discussed that may be of interest included:

- Report of a very large amount of what appears to be industrial grease located in the north-east comer of the pit. - EPA and DEC to investigate.

- Site evacuation alarm to be tested at noon on Friday, Jan 18.

- The Ground Zero Emergency Notification Number - 212-747-9193 is currently out of service. Until corrected, all WTC related emergencies should be reported to FDNY Manhattan Dispatch at 212-570-4261.

- Eight RAMS (Real-time Air Monitoring Stations) to be installed by ATC Environmental around the perimeter of the inner zone.

- Plans are being made to shrink the zone within the next couple of weeks. Plans are to remove the fence at the outer perimeter, leaving the inner perimeter as the zone.

- OSHA Analysis of bulk samples indicated a maximum level of 0.9 ppm of mercury. This sample was collected in the vicinity of 6 WTC. This level was reported to be within normal background levels for NYC. The maximum level of mercury detected at the Staten Island Landfill site was 0.1 ppm. Air monitoring results were non-detect for mercury. OSHA indicated that copies of their results are available in their office. I have asked if the info they have in their office is any different than the information posted on the internet. When I get this info. I'll pass it along.

- Lake Zero, the ponding of water in the lowest part of the excavation, was dewatered sometime during the past week. I understand that Mike Burton, Deputy Commissioner DDC, spoke to someone at DEP an advised that the presence of the water was interfering with the rescue efforts and that it needed to be removed. DDC was given the go ahead. Bob L. - Are you aware of this?

End of meeting Next meeting scheduled for Tuesday, Jan. 22, at 8:00 AM 3 World Financial Center, 26th Floor, Training Rm 5.

N.B. Last week, I asked Bob Adams, DDC, for copies of the analysis of the groundwater being discharged as part of the slurry wall pumping operation. He said he will get me a copy. I will forward this as well as any other water quality data he provides.

Paul.

3/7/2003

NYC-WTC_000164095

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000164095Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →