NYC 9/11 Public Portal Document
Gilsenan, Michael
From: Theodorellys, Penny
Sent: Tuesday. April 01, 2003 9:40 AM
To: [email protected]
Cc: Radhakrishnan, Krish; Gilsenan, Michael
Subject: 114 Liberty Street
Chuck-
The asbestos air results received so far were forwarded over by fax. The contractor was
directed to re-clean 7*. 8“^, and 10“’ floors. I’ll send the additional results as I receive
them.
Let me know about any issues you may have with any of the results ASAP.
Have you received any of the dioxin results directly? I know you have been dealing with the
lab. I am still waiting on the pre-dioxin results.
The pizza shop on the first floor has a deteriorated, heavily damaged ceiling. The material has
40-50% amosite and the substrate contains chrysotile. We are going to have to clean the
area and leave it isolated from the remainder of the building. The 9“’ floor asbestos results are
higher than the other floors received to date. The 9“’ floor has a pipe chase with in-place
insulation (the material is damaged). A tent was constructed around the material prior to
clearances. The architect was notified that the material would have to be addressed. As
noted above, we are having the apartment re-cleaned. —Just wanted to keep you in the loop
of information.
Keep in touch (718) 595-3657 or cell PH Thanks again for all your help.
u___________________
Penny