NYC 9/11 Public Portal Document
Tleodorellys Pe-
From: Theodorellys, Penny
Sent: Tuesday, April 01, 2003 10:10 AM
To: '[email protected]'
Cc: Radhakrishnan, Krish; Gilsenan, Michael
Subject: 114 Liberty Street
Chuck-
The asbestos air results received so far were forwarded over by fax. The
contractor was directed to re-clean 7th, 8th, 9 ', and 1011' floors. I'll send the
additional results as I receive them.
Let me know about any issues you may have with any of the results
ASAP.
Have you received any of the dioxin results directly? I know you have
been dealing with the lab. I am still waiting on the pre-dioxin results.
The pizza shop on the first floor has a deteriorated, heavily damaged
ceiling. The material has 40-50% amosite and the substrate contains
chrysotile. We are going to have to clean the area and leave it isolated
from the remainder of the building. The 9th floor asbestos results are
higher than the other floors received to date. The 9th floor has a pipe
chase with in-place insulation (the material is damaged). A tent was
constructed around the material prior to clearances. The architect was
notified that the material would have to be addressed. As noted above,
we are having the apartment re-cleaned. ---Just wanted to keep you in the
loop of information.
Keep in touch (718) 595-3657 or cell (917) 769-1029. Thanks again for all
your help.
Penny