Document / 2 pages

Wall marking completion status update, Mar 2003

Machine-extracted title · confidence 80%

Update on completion of wall marking for remediation with notes on missed areas and pending clarifications.

NYC-WTC_000163047–000163048

Folder label: “E-mails 2003 M. Gilsenan

Page image
Scanned page image, NYC-WTC_000163048
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Christopher Warnick / Architecture 160 Columbia Heights 8E Brooklyn, NY 11201 718.422.0600

MEMO 10 March 2003

Penny Theodorellys NYC DEP 59-17 Junction Boulevard 8th Floor Flushing, New York 11373-5108

RE: 114 Liberty Street New York, NY Removals and Cleaning

Dear Penny,

Pursuant to a meeting yesterday with ETS and JLC, I've been asked to prepare a Memo for purposes of clarification.

The following items were discussed at the site on 3/9/03.

1. The walls are thoroughly marked in green paint. However, the contractors may find that the elevator walls and east and west walls of the commercial spaces are of solid plaster. It is not necessary to remove any plaster walls. Also, the intent of the plans is to remove one side of every wall, while at the same time, keeping stone panels in place, including the stone in the lobby, kitchens and bathrooms. If, after the green marked walls are removed, there are still some areas that are not easily cleaned, please contact our office to review the field condition.

2. All drywall ceilings are to be removed throughout. Stone ceilings in showers and steam showers to remain. Take extra care to retain black iron system and framing elements.

3. Light trims to be removed from ceilings. All light fixture housings to remain attached to ceiling framing, whenever possible, and cleaned in place.

4. Remove faceplates on all electrical switches and outlets. Do not disconnect items, but pull forward in box and clean in place.

5. Please issue ETS and JLC the HVAC Shop Drawing that our office sent to Krish. It will help them in understanding DEP Spec Item #14.

Please feel free to contact me with any questions. Thank you.

Very Truly Yours,

Christopher Warnick, RA

Cc: D. Stanke Denise Sweeny

NYC-WTC_000163048

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000163048Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →