1 shared topics · similarity 0.922
machine-extracted · confidence unavailable · Check page ↗Maintenance division authorization plan, November 2008
Machine-extracted title · confidence 95%Form from the Bureau of Water & Sewer Operations Maintenance Division listing authorized and actual maintenance counts.
NYC-WTC_000159445–000159447Folder label: “2007 Steam Pipe Explosion - 41st St. + Lexington Ave”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
BUREAU OF WATER & SEWER CONSTRUCTION DIVISION Last Modified 12/11/2008 Auth. Plan s 34 Actual on board = 35 CWuNSCM, W-w
B/FKRWKO NOTONPIPBJNE
I MOOLAMAN ABRAHAM, P.B. CHIEF OF CONSTRUCTION ADMIN. ENGINEER. M-HI
IFA - B002 BC0286
CAMILLE COLEMAN KIMBERLY DAVIS OFFICE SUPPORT OFFICE SUPPORT P.A.A. n P.A.A. I
_________ I I I _______ KENNETH HBSSBLBACHKER, P.E. LUIS CAMINBRO ANASTASIOS GEORGELIS DANIEL LEFKOWITZ, P.B. CONTRACT PAYMENT / ADMIN. DEPUTY CHEIF. PRIVATE INTRF. DEPUTY CHIEF. WATER CONSTR. DEPUTY CHIEF. SEWER CONST. ASSOC. PROJ. MANAGER n AOMIN. PROJ. MAN. I CIVIL ENGINEER UI CIVIL ENGINEER in
IFA - DOlO BC0287 IFA - DO16 BC0287 IFA-D023 BC0286
ANGELO LORENZO RAYNOLO AUGUSTIN THECHtDOREPAOCELMAN FATHI HUSEIN, P.E. SUPV. BRIDGE WATER MAINS TTME&MATBUALOJNTRACTS SUPV. ENGINEERING ASSOC. PROJ. MANAGER U ASSOC PROJECT MANAGER 1 ASSOC PROJ. MANAGER n CIVIL ENGINEER n
IFA - 0012 BC0287 IFA-0004 BC0287 (ON PIPELINE pS 11779) IFA - 0018 BC0288
SAURIN PARIKH FREDDY RICCI PAUL RHONE SASHIN PARIKH
CONST. PROJKT MAN. II DISTRICT SUPV. PPOJECT MANAGER ASSOC. PROJ. MANAGER I
IFA » 0014 BC0286 IFA - 0032 BC 0286 IFA - 0018 BC0286 CARL SANTORO MILTON GALLOWAY, P.B. EDDY BRUN VINCENT STENDARDO ASSOC. PROJ. MANAGER I CIVIL ENGINEER. I CONST. PROJECT MAN. II ASSOC. PROJ. MANAGER I IFA-0013 BC0286 IFA - 0007 BC 0286 IFA - 0017 BC0287 THOMAS ANDERSON SMARK SALOMON SAMIR IBRAHIM STEPHEN ZUZZOLO ASSOC. PROJ. MANAGER I CONST. PROJECT MAN. U ASSOC. PROJ. MANAGER I ASSOC. PROJ. MANAGER I IFA > 0015 BC0286 IFA - D019 BC 0286 IFA - 0020 BC0287 10O*HBN6SEET JOSEPH NATALE LONNIE MCCOY THOMAS ZACHARIAH CONSTR. PROJ. MANAGER 11 A.P.M. I CONSTR. PROJ. MANAGER H ASSOC. PROJ. MANAGER I IFA -0024 BC0286 IFA -D035 BC 0287 IFA - 0002 BC0286 MOHAMMAD AARABI KACHIWKU NWOSU JOHN MIERZEIEWSKl HERMAN YAHN CONSTR. PROJ. MANAGER n ASSOC. PROJ. MANAGER I ASSOC. PROJ. MANAGER ASSOC. PROJ. MANAGER I IFA-DOOl BC0286 IFA - D003 BC 0286 GODWIN KWAMI THOMAS PIGNATELLI IFA - 0036 BC 0286 CORBETT GARRETT A.C.E. A.P.M. I HUBERT GARCIA CONSTR. LABORER IFA - B003 BC0275 IFA-0046 BC0286 ASSOC. PROJ. MANAGER I AMRIT SHRIVASTAVA
.ASSOC PROJ. MANAGER I
IFA - 0033 BC0286 FIELD OPS 8
NYC-WTC_000159447
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
No available related records indexed in this group.
Filed elsewhere
1 shared topics · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗1 shared topics · similarity 0.912
machine-extracted · confidence unavailable · Check page ↗1 shared topics · similarity 0.912
machine-extracted · confidence unavailable · Check page ↗1 shared topics · similarity 0.912
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152099
Memo discussing a Commissioner's Order to clean WTC residue from a vacant building near the World Trade Center site.
1 shared topics · similarity 0.910
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165833
Letter from STV&K submitting revised engineering plans for the 10th Avenue tunnel project in accordance with DEP comments.
1 shared topics · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165840
Letter from engineers submitting revised plan sets in response to previous department comments on the tunnel project.
1 shared topics · similarity 0.908
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165058
Letter submitting drawings for a low-level gravity house connection from the New York Exposition Center to the city interceptor in January 1984.
1 shared topics · similarity 0.906
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165480
March 25, 1982 DEP memorandum from Engineering Review Section requesting a field inspection of the double barrel sewer at Pier 86.
1 shared topics · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165797
Letter from STV&K submitting revised utility and project drawings and sewer chamber computations to DEP, incorporating earlier department comments.
1 shared topics · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗1 shared topics · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000159416
Record documenting an explosion incident on 41st Street in 2007 involving environmental response.
Filed in the same folder
NYC-WTC_000159418
Fragment of a record from the collection regarding the 2007 gas explosion incident at East 41st Street.
Filed in the same folder
NYC-WTC_000159419
Memo transmitting water sample results collected at East 41st Street following the 2007 explosion.
Filed in the same folder
Request to shut down water main at 41st Street due to explosion and construction work.
Filed in the same folder
NYC-WTC_000159431
Administrative routing form used to track the approval and clearance of documents related to the 2007 explosion response.
Filed in the same folder