NYC-WTC_000123131
Invoice for roof asbestos abatement work completed at 196 Broadway covering over 32,000 square feet.
3 shared non-person entities · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗Correspondence regarding water main replacements at a site with a street cave-in and retaining wall scope sketches.
NYC-WTC_000159253–000159282Folder label: “PUBLIC AFFAIRS INQUIRY”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
03/10/2024 00:40 212-669-4980 PAGE 09/25
The concrete sidewalk at the middle of the retaining wall ha.s also .settled and is uneven. Sec Photograph 7. This movement is the result of the retaining wall shifting which allows the soil behind the retaining wall to settle as the volume of .soil redistributes Itself.
The concrete sidewalk at the north end of the retaining wall hns negligible settlement. Sec Photograph 1.
3. One section of concrete curb along the we.st side of Cannon Place at the middle of the retaining wall has shifted west approximately 2”. Sec Photograph 8. This movement is the result of the retaining wall shifting and the volume of .soil behind the retaining wall redistributing itself.
4. A section of the asplialt pavement adjacent to the shifted concrete curb is breaking up. See Photograph 9. This breaking up is the result of the retaining wall shifting and the volume of soil behind the retaining wall rcdwtribuling itself.
5. The Site of the propn.ssd new Building is tlic side of a hill with a rock outcrop along Fort •j
Independence Street.
A dry-laid rubble stone retaining wall is inherently unstable given that the stones arc not mortared together to create a monolithic wall. A dry-laid rubble stone wall is also veiy susceptible to movement caused by freeze-thaw cycles as the water within the joints repeatedly expands with each freeze cycle and pushes the individual stones. A dry-laid rubble .stone wall is also very susceptible IO movement caused by vibration given that the stones are noi bonded together with mortar.
The dry-laid rubble stone wall on the west side of Cannon Place is continuouKly shifting as indicated by the conditions discussed above. Given that some type of rock excavation will be required to install the foundation of the proposed new Building the probability of damage to the adjacent private property and the dry-laid rubble stone retaining waft caused by vibrations during construction is very high. In order to protect the Public and Private Property Owners from the loss that would occur .should another section of this retaining wall fail the City of New York niseds to implement the following .safeguards.
A. Prior to construction beginning the location of the surface of the retaining wall nccd.s to be surveyed at 10’ intervals along the entire length of retaining wall.
B. Also prior to construction beginning all existing Buildings adjacent to the retaining wall shall have a Pre-Construction survey performed to thoroughly document the existing conditions.
C- While the foundation of the propo.sed new Building is being constructed, including excavation, the location of the surface of the retaining wall needs to be monitored on a ivcekJy ba.sis. If the retaining wall begins to .shift the construction shall be halted until the retaining wall is stabilized. When construction restarts the retaining wall monitoring shall recommence. This cycle shall be repeated as many times as required.
NYC-WTC_000159266
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000123131
Invoice for roof asbestos abatement work completed at 196 Broadway covering over 32,000 square feet.
3 shared non-person entities · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108177
Single-page document containing identification codes and file references for World Trade Center environmental records at 120 Liberty Street.
3 shared non-person entities · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114830
Invoice from Kurzban & Son Contrldl Inc. for asbestos removal work at 50 Pine Street totaling $12,084.00.
2 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130855
Invoice from Asbestos Removal Corp for roof cleanup services at 40 Exchange Place dated September 18, 2002.
3 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093100
A transmittal letter dated March 25, 2003, accompanying an attached report regarding air quality or environmental conditions at a specified location.
Similar document embedding; no shared entity or topic indexed. · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128434
Automated fax transmission log record dated October 24, 2002, confirming successful delivery of asbestos or lead test results.
1 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117805
Invoice from Fiber Control Inc. for cleaning a gravel roof at 2 South End Avenue totaling $59,883.10.
3 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102171
September 2002 invoice from Benjamin Kurzban Son Control Inc for work completed at 25 Maiden Lane.
3 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114261
Invoice from Benjamin Kurzban & Son Control Inc. for asbestos abatement and cleanup at 12 Platt Street.
2 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152717
Page containing garbled text and binary data from a Department of Environmental Protection document.
2 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115536
Invoice from Benjamin Kurzban & Son Control Inc. to the DEP for roof cleaning work at 29 Park Row.
3 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Unreadable page containing no legible text or identifiable subject matter.
Filed in the same folder
Unreadable document page containing no legible text or identifiable subject matter.
Filed in the same folder
NYC-WTC_000159250
Correspondence discussing water main replacements due to age and a street cave-in investigation at an unspecified location.
Filed in the same folder
Filed in the same folder
NYC-WTC_000159285
Official letter confirming substantial completion of work under Contract REG-024D subject to outstanding punch list items.
Filed in the same folder