December 17, 2002 114 LIBERTY STREET
REMOVAL OF DUST, DEBRIS. AND CONTAMINATED MATERIALS
Copper, Lead, Nickel and Zinc. Exposure to these contaminants may cause various adverse
health effects. For example, inhalation of dust that is contaminated with heavy metals can elicit
a variety of health symptoms, both short and long term, depending upon the duration of
exposure, concentration of the contaminants, the specific metals in the dust, and personal
factors of the exposed person. Cadmium and lead are systemic toxins that adversely affect
major organ systems. Exposure to zinc fumes can result in an illness known as metal fume
fever. Therefore, special training of personnel, special equipment and special care must be
exercised in the removal and handling of contaminated dust, debris, and materials. Details of
these requirements are provided in this design document and all attendant references.
1.04 POTENTIAL MICROBIAL HAZARD:
A. Water damage in the building has resulted in microbial growth on various building materials,
including underneath the hardwood flooring. Exposure to fungal aerosols can cause allergic
respiratory diseases (e.g., hypersensitivity pneumonitis and asthma), mycotoxicosis, and/or
infections in individuals with pre-existing chronic disease (e.g., compromised immune systems).
Therefore, special training of personnel, special equipment and special care must be exercised
in the removal and handling of microbial-contaminated materials (see Section 9 Worker
Protection, 1.02). Details of these requirements are provided in this design document and ail
attendant references.
1.05 STOP WORK:
A. If either the Owner, or Ambient Group, presents a written stop work order, immediately and
automatically stop all work. Do not recommence work until authorized in writing by either the
Owner, or Ambient Group.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.01 CONTRACTOR USE OF THE SITE:
A. The site will be accessible on the date specified by the Owner. Dust, debris and contaminated
material removal work shall occur as noted in these design documents. No removal shall occur
at any other time.
B. The Contractor shall confine his apparatus, the storage of materials and the operation of his
workmen to limits established by law, ordinances, permits or directions of the Owner and shall
not unreasonably encumber the premises with his materials. All flammable and/or combustible
materials shall be properly identified and can only be stored in areas approxed by the Owner.
The Contractor shall also obtain permits which may be required for storage of such materials.
C. The Contractor shall assure that appropriate safety barriers are established to prevent access to
Work Areas and that Work Areas are kept neat, clean and safe.
D. The Contractor shall not load or permit any part of the structure to be loaded with a weight that
will endanger its safety.